the Laka catalogue

Overview on author us-nrc

datetitleauthorcategory
2005-07 Information Digest, 2005-2006 EditionUS NRC united states - general
2004 Status of Decommissioning Program 2004 Annual ReportUS NRC decommissioning
1997-12Probabilistic accident consequence uncertainty analysis. Late health effects uncertainty assessment. Vol.1. Main report (NUREG/CR-6555)US NRC, CEC nuclear safety - risk analyses / risk perception
1997-12Probabilistic accident consequence uncertainty analysis. Late health effects uncertainty assessment. Vol.2. Appendices (NUREG/CR-6555)US NRC, CEC nuclear safety - risk analyses / risk perception
1997-12Probabilistic accident consequence uncertainty analysis. Uncertainty assessment for deposited material and external doses. Vol.2. Appendices (NUREG/CR-6526)US NRC, CEC nuclear safety - risk analyses / risk perception
1997-12Probabilistic accident consequence uncertainty analysis. Early health effects uncertainty assessment. Vol.1. Main report (NUREG/CR-6545)US NRC, CEC nuclear safety - risk analyses / risk perception
1997-12Probabilistic accident consequence uncertainty analysis. Early health effects uncertainty assessment. Vol.2. Appendices (NUREG/CR-6545)US NRC, CEC nuclear safety - risk analyses / risk perception
1997-06Probabilistic accident consequence uncertainty analysis. Food chain uncertainty assessment. Vol.1. Main report (NUREG/CR-6523)US NRC, CEC nuclear safety - risk analyses / risk perception
1997-06Probabilistic accident consequence uncertainty analysis. Food chain uncertainty assessment. Vol.2. Appendices (NUREG/CR-6523)US NRC, CEC nuclear safety - risk analyses / risk perception
1994Probabilistic accident consequence uncertainty analysis. Dispersion and deposition uncertainty assessment. Vol.1. Main report (NUREG/CR-6244)US NRC, CEC nuclear safety - risk analyses / risk perception
1994Probabilistic accident consequence uncertainty analysis. Dispersion and deposition uncertainty assessment. Vol.2. Appendices A and B (NUREG/CR-6244)US NRC, CEC nuclear safety - risk analyses / risk perception
1994Probabilistic accident consequence uncertainty analysis. Dispersion and deposition uncertainty assessment. Vol.3. Appendices C, D, E, F, G (NUREG/CR-6244)US NRC, CEC nuclear safety - risk analyses / risk perception
1992-04Certificate of compliance for the ventilated storage cask (VSC-24) for irradiated fuelUS NRC united states - waste - general
1990NRC Telephone DirectoryUS NRC united states - general
1990Severe accident risks: an assessment for five U.S. nuclear power plants. Vol.3. Appendices D and E (NUREG-1150)US NRC nuclear safety - risk analyses / risk perception
1990-12Severe accident risks: an assessment for five U.S. nuclear power plants. Vol.1. Final summary report (NUREG-1150)US NRC nuclear safety - risk analyses / risk perception
1990-12Severe accident risks: an assessment for five U.S. nuclear power plants. Vol.2. Appendices A, B, and C (NUREG-1150)US NRC nuclear safety - risk analyses / risk perception
1989-12Certificate of compliance for dry spent fuel storage casks 10 CFR 72US NRC united states - waste - general
1988-05Findings of the Peer Review. Panel on the Draft Reactor RiskUS NRC nuclear safety - risk analyses / risk perception
1987-12Methodology for uncertainty estimations in Nureg-1150Brookhaven Nat. Lab, US NRC nuclear safety - risk analyses / risk perception
1987-07NRC Staff Evaluation of General Electric Company Nuclear Reactor StudyUS NRC nuclear safety - reactors - pressurized water (pwr) / boiling water (bwr)
1987-07NRC Staff Evaluation of the General Electric Company Nuclear Reactor Study ("Reed Report")US NRC nuclear safety - reactors - pressurized water (pwr) / boiling water (bwr)
1987-05Uncertainty papers on severe accident source terms (NUREG-1265)US NRC nuclear safety - sourceterm
1987-02Reactor Risk Reference Document. NUREG-1150 Main ReportUS NRC nuclear safety - risk analyses / risk perception
1986-07Reassessment of the technical bases for estimating source terms (NUREG-0956)US NRC nuclear safety - sourceterm
1986-07Reassessment of the technical bases for estimating source terms (NUREG-0956)US NRC nuclear safety - sourceterm
1986-06NRC 1985 Annual ReportUS NRC united states - general
1985Standards for protection against radiationUS NRC radiation - standards
1985-09Safety evaluation report related to the topical safety analysis report for Castor V/21 dry spent fuel storage cask submitted by General Nuclear Systems inc.US NRC transports - safety / technology (containers/ships/etc)
1984-09Probabilistic Risk Assessment (PRA) Reference DocumentUS NRC nuclear safety - risk analyses / risk perception
1984-03Federal Register: part V.: Nuclear Regulatory CommissionUS NRC united states - general
1983-08Rule to achieve compatibillity with transport regulations of IAEAUS NRC transports - legislation
1981-06Final environmental statement related to the operation of Susquehanna Steam Electric Station, units 1 and 2 (NUREG-0564)US NRC united states - sites - north east other
1981-06Technical bases for estimating fission product behaviour during LWR accidentsUS NRC nuclear safety - sourceterm
1980Draft Generic Environmental Impact Statement on decommissioning of nuclear facilitiesUS NRC decommissioning
1980-09Report to the Congres on abnormal occurences January - March 1980US NRC, Nureg united states - safety
1980-09LER Monthly Report July 1980US NRC united states - safety
1979-08Report of the Siting Policy Task Force (NUREG-0625)US NRC united states - safety
1979-08Handling and storage of spent light water power reactor fuel. Volume I. Executive summary and textUS NRC united states - waste - general
1979-08Report of the Siting Policy Task ForceUS NRC nuclear safety - site selection / emergency plans
1978Transcripts of verbatim records of meetings of the NRC. Vol.1US NRC united states - sites - harrisburg (tmi)
1978Transcripts of verbatim records of meetings of the NRC. Vol.2US NRC united states - sites - harrisburg (tmi)
1978Transcripts of verbatim records of meetings of the NRC. Vol.3US NRC united states - sites - harrisburg (tmi)
1978Transcripts of verbatim records of meetings of the NRC. Vol.4US NRC united states - sites - harrisburg (tmi)
1978Transcripts of verbatim records of meetings of the NRC. Vol.5US NRC united states - sites - harrisburg (tmi)
1978Transcripts of verbatim records of meetings of the NRC. Vol.6US NRC united states - sites - harrisburg (tmi)
1978-05Spent fuel Heatup following Loss of water during StorageUS NRC waste - storage on land / saltdomes (incl. synroc)
1977-11Draft environmental standard review: plans for environmental review of construction permit applications for nuclear power plantsUS NRC united states - safety
1976-08Studies comparing the greatest possible failure sequence in a processing installation and in a nuclear power plantUS NRC nuclear safety - risk analyses / risk perception
1976-07Preparation of environmental reports for NP stationsUS NRC united states - general
1975-11Regulatory Guide 4.7: General Site Suitability Criteria for Nuclear Power StationsUS NRC nuclear safety - site selection / emergency plans
1975-10Assessment of accident risks US commercial NPPUS NRC united states - safety
Reactor Risk Reference DocumentUS NRC united states - safety