Tijdschrift:
Trefwoord: PERRY, OHIO, USA×

Omschrijving: Perry, Ohio, USA

Titel Auteur Datum Tijdschrift  categoriëen / verklein selectie
An Atomic Safety and Licensing Appeal Board (ASLAB) 07-04-1986 NM HOORZITTINGEN PERRY, OHIO, USA VS
Appeals court refuses NRC bid to vote license for Perry 22-09-1986 NM NRC PERRY, OHIO, USA RECHTZAKEN VEILIGHEID REACTOR VERGUNNINGEN VS
Canada's Energy Probe and Ohio's Western Reserve Alliance 26-01-1987 NM ACTIES PERRY, OHIO, USA TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS
Celeste vows all "legally possible" to block Perry, Davis-Besse 12-01-1987 NM DAVIS-BESSE OPSTARTEN PERRY, OHIO, USA RAMPENPLANNEN VEILIGHEID REACTOR VS
Centerior Energy's Perry reactor was the 100th plant licensed in the U.S. 03-12-1990 NM ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES PERRY, OHIO, USA TECHNISCH ALGEMEEN VS
Cleveland Electric Illuminating has asked the NRC for a 10 year extension 13-01-1992 NM BOUW VAN KERNCENTRALE PERRY, OHIO, USA VERGUNNINGEN VS
Cleveland Electric Illuminating's Perry-1 plant became 24-03-1986 NM HANFORD N, USA OPSTARTEN PERRY, OHIO, USA VERGUNNINGEN VS
Court turns down Perry appeal; Celeste vows states rights case 20-10-1986 NM HOORZITTINGEN PERRY, OHIO, USA RECHTZAKEN VERGUNNINGEN VS
DLJ issues third report on plant construction 07-04-1986 NM BOUW VAN KERNCENTRALE GRAND GULF, USA KOSTEN KERNENERGIE LIMERICK, PENN, USA MIDLAND, USA ONDERZOEK PERRY, OHIO, USA SEABROOK, USA SOUTH TEXAS, USA VS WNP, WASHINGTON, USA
Emergency planning controversy spreads to Perry reactor 16-06-1986 NM ONDERZOEK OPSTARTEN PERRY, OHIO, USA RAMPENPLANNEN RISICO ANALYSE SHEARON HARRIS, USA VERGUNNINGEN VS
FEMA to issue negative finding on Perry evacuation plan 03-11-1986 NM PERRY, OHIO, USA RAMPENPLANNEN VERGUNNINGEN VS
In other emergency planning developments, Ohio Governor 24-08-1987 NM ONDERHOUD EN REPARATIE PERRY, OHIO, USA RAMPENPLANNEN VS
Intervenor Groups oppose Cleveland Electric/ Toledo Edison merger 07-10-1985 NM BEAVER VALLEY, USA DAVIS-BESSE ELEKTRICITEITSBEDRIJVEN OVERNAME PERRY, OHIO, USA VS
NRC grants emergency exemption, full-power license to perry 17-11-1986 NM NRC PERRY, OHIO, USA RAMPENPLANNEN VERGUNNINGEN VS
NRC investigates substantial Perry construction allegation 07-10-1985 NM BOUW VAN KERNCENTRALE CENSUUR NRC ONDERZOEK PERRY, OHIO, USA VS
Nuclear notes; ...and in the states 01-11-1996 NM BALTIMORE GAS & ELEC CALVERT CLIFFS, USA CENTERIOR ENERGY DAVIS-BESSE ENTERGY CORPORATION FITZPATRICK INDIAN POINT, USA LA SALLE, USA LES (LOUIS.ENER.SERVICES) NORTHERN STATES POWER, VS NRC NYPA PERRY, OHIO, USA PILGRIM, MASS. USA TMI VERRIJKING VS WESTINGHOUSE
Ohio Edison: Perry not a "low cost, superior alternative" 30-11-1987 NM KOSTEN VERGELIJKING PERRY, OHIO, USA VS
Ohio governor withdraws state support for evacuation plans 11-08-1986 NM DAVIS-BESSE NRC PERRY, OHIO, USA POLITIEK RAMPENPLANNEN VEILIGHEID-ONDERZOEK VERGUNNINGEN VS
Ohio: a 36-inch fiberglass pipe carrying water from the cooling tower 27-01-1992 NM KOELTORENS ONGELUKKEN KERNCENTRALES PERRY, OHIO, USA VS
Ohio: Centerior electric's Perry reactor had cost some $6 Billion 01-01-1996 NM BOUW VAN KERNCENTRALE CENTERIOR ENERGY KOSTEN KERNENERGIE PERRY, OHIO, USA VS
Ohio: Ohio Edison has formally written off its 30% share of the Perry-2 reactor 20-12-1993 NM ELEKTRICITEITSBEDRIJVEN PERRY, OHIO, USA VS
Perry cleared for fuel load but intervenors seek stay 23-09-1985 NM OPSTARTEN PERRY, OHIO, USA VERGUNNINGEN VS
Perry fuel load delayed by earthquake; new hearings possible 24-02-1986 NM PERRY, OHIO, USA RISICO ANALYSE TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS
Perry utilities sue GE over design flaws 09-09-1991 NM GE - GENERAL ELECTRIC NRC PERRY, OHIO, USA RECHTZAKEN TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS
Plain-dealer breaks GE story, then reassigns reporter 15-06-1987 NM BOUW VAN KERNCENTRALE CENSUUR GE - GENERAL ELECTRIC NRC PERRY, OHIO, USA VEILIGHEID REACTOR VS ZIMMER, OHIO, USA
Recent reactor trips challenge safety system at several reactors 12-02-1990 NM DRESDEN, USA MCGUIRE PERRY, OHIO, USA SOUTH TEXAS, USA TECHNISCH ALGEMEEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS
States rights conflict appears imminent over Perry license 08-09-1986 NM NRC OPSTARTEN PERRY, OHIO, USA VERGUNNINGEN VS
Status of reactors under construction 12-02-1990 NM BELLEFONTE, USA BOUW VAN KERNCENTRALE COMANCHE PEAK, USA KOSTEN KERNENERGIE PERRY, OHIO, USA SEABROOK, USA SHOREHAM, NY, USA VS WATTS BAR, USA
Status of reactors under construction 30-10-1989 NM BELLEFONTE, USA BOUW VAN KERNCENTRALE COMANCHE PEAK, USA KOSTEN KERNENERGIE PERRY, OHIO, USA SEABROOK, USA SHOREHAM, NY, USA VS WATTS BAR, USA
Status of reactors under construction 06-03-1989 NM ALVIN W VOGTLE, USA BELLEFONTE, USA BOUW VAN KERNCENTRALE COMANCHE PEAK, USA ELEKTRICITEITSBEDRIJVEN GRAND GULF, USA KOSTEN KERNENERGIE LIMERICK, PENN, USA PERRY, OHIO, USA SEABROOK, USA SHOREHAM, NY, USA SOUTH TEXAS, USA VS WATTS BAR, USA