Titel |
Auteur |
Datum |
Tijdschrift | categoriëen / verklein selectie |
"Critical hour" is critical reading |
NIRS; Albert J. Tritsch; Arthur H. Purcell; Mary Byrd Davis |
01-03-2004 |
NM |
AEC BELANGENVERSTRENGELING BELGONUCLÉAIRE BRANDSTOF FABRICAGE CAMECO COGEMA ECONOMIE - ALGEMEEN ENERGIEBELEID KE LOBBY BEDRIJVEN MORATORIUM NRC ONDERWIJS PHASE-OUT RECENSIES REGERING SUBSIDIES VOOR KERNENERGIE TMI URENCO VEILIGHEID-ONDERZOEK VS |
A month-long investigation by Commonwealth Edison of firewatch record |
|
04-04-1988 |
NM |
BYRON, USA VEILIGHEID-ONDERZOEK VS |
A new report by the General Accounting Office has revealed |
|
18-04-1988 |
NM |
TECHNISCH ALGEMEEN TROJAN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
A new study by a university of California at Santa Barbara |
|
26-02-1990 |
NM |
VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
A routine 24-hour surveillance test of a diesel generator |
|
15-01-1990 |
NM |
SOUTH TEXAS, USA VEILIGHEID-ONDERZOEK VS |
ACRS wary of NRC's basic reactor safety report |
|
17-12-1990 |
NM |
NRC VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
AEOB report finds widespread maintenance deficiencies |
|
01-05-1989 |
NM |
KOSTEN KERNENERGIE NRC TECHNISCH ALGEMEEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
AEOD warns of air system dangers at all U.S. reactors |
|
25-01-1988 |
NM |
TECHNISCH ALGEMEEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
An NRC report that concludes that a standard French reactor |
|
20-10-1986 |
NM |
FRANKRIJK NRC PWR VEILIGHEID-ONDERZOEK VS |
Another NRC study finds dangers with Mark I's, other reactors |
|
05-10-1987 |
NM |
GE - GENERAL ELECTRIC INHERENT VEILIGE EN NIEUWE REACTOREN NRC ONGELUKKEN KERNCENTRALES PWR TECHNISCH ALGEMEEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
ASLB accepts Comanche Peak settlement; new intervention possible |
|
11-07-1988 |
NM |
COMANCHE PEAK, USA MILIEUGROEPEN NRC SAMENWERKING VEILIGHEID-ONDERZOEK VERGUNNINGEN VS |
ASLB clears way for Harris licensing, but new contention filed |
|
05-05-1986 |
NM |
BRUNSWICK, USA GEZONDHEID WERK OPSTARTEN SHEARON HARRIS, USA VEILIGHEID-ONDERZOEK VERGUNNINGEN VS |
Asselstine blasts Stello testimony on role of investigations |
|
29-06-1987 |
NM |
NRC OPINIE ALGEMEEN VEILIGHEID-ONDERZOEK VS |
Atomic waste once again will be a major capitol hill issue; Mobile Chernobyl, Yu |
|
01-11-1998 |
NM |
AFVAL TRANSPORT ACTIES EPA MILIEUGROEPEN NRC VEILIGHEID-ONDERZOEK VS WETGEVING YUCCA MOUNTAIN |
Biden re-introduces nuclear safety board legislation |
|
08-04-1991 |
NM |
VEILIGHEID-ONDERZOEK VERGUNNINGEN VS WETGEVING YANKEE ROWE |
California: with the help of an extremely powerful congressional delegation |
|
23-09-1991 |
NM |
DIABLO CANYON - USA MILIEUGROEPEN RISICO ANALYSE VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
Calvert Cliffs, Diablo Canyon SALPS show declining performance |
|
11-01-1988 |
NM |
CALVERT CLIFFS, USA DIABLO CANYON - USA VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VERGUNNINGEN VS |
Carr says NRC should cut plant inspections by 75% |
|
22-10-1990 |
NM |
NRC VEILIGHEID-ONDERZOEK VS |
Castor and terror |
|
01-12-2001 |
NM |
AFVAL TRANSPORT DUITSLAND SABOTAGE TECHNISCH ALGEMEEN VEILIGHEID-ONDERZOEK |
Coalition asks for NRC removal of top TROJAN management |
|
22-09-1986 |
NM |
AFVAL ALGEMEEN NRC OPINIEPEILINGEN TROJAN VEILIGHEID-ONDERZOEK VS |
Continuing its tradition of putting the cart before the horse |
|
25-04-1994 |
NM |
DOE - USA NRC VEILIGHEID-ONDERZOEK VERGUNNINGEN VS YUCCA MOUNTAIN |
Cook, Byron receive improved, but still average, SALPS |
|
05-04-1987 |
NM |
BYRON, USA DONALD C COOK, USA TECHNISCH ALGEMEEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
Cook, LaSalle bomb on SALP reports; Maine, CP&L rated up |
|
10-03-1986 |
NM |
DONALD C COOK, USA LA SALLE, USA NRC VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
CP&L SALPS show continued middling performance |
|
19-10-1987 |
NM |
BELANG KE IN ENERGIEPRODUCTIE BRUNSWICK, USA BWR GEZONDHEID WERK H.B.ROBINSON, USA LEVENSDUURVERLENGING NRC SHEARON HARRIS, USA STRALING METINGEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
Cracks found in Oyster Creek core shroud |
|
21-11-1994 |
NM |
AKB NRC ONDERHOUD EN REPARATIE OYSTER CREEK, NJ,USA TECHNISCH ALGEMEEN VEILIGHEID-ONDERZOEK VS |
Detroit Edison lambasted by NRC, INPO, Lawrence Livermore |
|
21-09-1987 |
NM |
FERMI, USA INPO NRC ONDERHOUD EN REPARATIE OPSTARTEN TECHNISCH ALGEMEEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VERGUNNINGEN VS |
Dingell grills NRC commissioners over Thermo-lag |
|
15-03-1993 |
NM |
NRC TECHNISCH ALGEMEEN THERMAL SCIENCE VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
End of the road for Thermo-Lag? NRC demands new data |
|
16-01-1995 |
NM |
NRC TECHNISCH ALGEMEEN THERMAL SCIENCE VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS |
Epect GPU's Oyster Creek reactor to remain shut down for several |
|
21-09-1987 |
NM |
CENSUUR NRC ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES OYSTER CREEK, NJ,USA VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VS WETGEVING |
European loan for Cernavoda |
FOE Europe press release, 30 March 2004 |
02-04-2004 |
NM |
CANDU CERNAVODA, ROEMENIE EU / EEG EURATOM FOE JUSTITIEELE FOUTEN ROEMENIË SUBSIDIES VOOR KERNENERGIE VEILIGHEID-ONDERZOEK |