Titel |
Auteur |
Datum |
Tijdschrift | categoriëen / verklein selectie |
A definitive schedule for reviewing Tennessee Valley Authority's (TVA's) applica |
|
07-04-2004 |
WNAN |
LEVENSDUURVERLENGING TVA VERGUNNINGEN VS |
American Electric Power (AEP) plans to replace the reactor vessel heads |
|
30-07-2003 |
WNAN |
DONALD C COOK, USA FRAMATOME ANP KOSTEN KERNENERGIE LEVENSDUURVERLENGING TECHNISCH ALGEMEEN VERGUNNINGEN VS |
An application to extend the operating licences of Dominion's Surry-1 and -2 |
|
09-05-2002 |
WNAN |
LEVENSDUURVERLENGING NRC SURRY, USA VERGUNNINGEN VS |
An application to renew the operating licence of the Farley |
|
17-09-2003 |
WNAN |
FARLEY LEVENSDUURVERLENGING NRC VERGUNNINGEN VS |
An application to renew the operating licence of the Monticello |
|
23-03-2005 |
WNAN |
AFVAL ON SITE STORAGE LEVENSDUURVERLENGING MONTICELLO, USA VERGUNNINGEN VS |
An application to renew the operating licenses of the Cook-1 and -2 |
|
29-10-2003 |
WNAN |
DONALD C COOK, USA LEVENSDUURVERLENGING VERGUNNINGEN VS |
At Monitor presstime, it appeared that the NRC was on the verge |
|
18-11-1991 |
NM |
LEVENSDUURVERLENGING VEILIGHEID REACTOR VERGUNNINGEN VS |
Behind the "ironic curtain": The U.S. public and NRC license renewal for aging.. |
Paul Gunter |
01-01-2002 |
NMNA |
BELANGENVERSTRENGELING CALVERT CLIFFS, USA CENSUUR DEMOCRATIE HOORZITTINGEN KOSTEN KERNENERGIE LEVENSDUURVERLENGING NRC ONGELUKKEN KERNCENTRALES PARLEMENT RISICO ANALYSE VEILIGHEID-ONDERZOEK VERGUNNINGEN VS YANKEE ROWE |
Constellation Energy has submitted an application |
|
26-05-2004 |
WNAN |
LEVENSDUURVERLENGING NINE MILE POINT, USA VERGUNNINGEN VS |
Dominion has applied to the Nuclear Regulatory Commission (NRC) |
|
21-01-2004 |
WNAN |
LEVENSDUURVERLENGING MILLSTONE, CONN. USA VERGUNNINGEN VS |
Entergy Nuclear has submitted an application to renew |
|
15-10-2003 |
WNAN |
ARKANSAS NUCLEAR ONE ENTERGY NUCLEAR LEVENSDUURVERLENGING NRC VERGUNNINGEN VS |
Entergy will postpones its licence renewal application for the pilgrim |
|
03-03-2004 |
WNAN |
ELEKTRICITEITSPRIJS ENTERGY NUCLEAR LEVENSDUURVERLENGING PILGRIM, MASS. USA VERGUNNINGEN VS |
Environmentalists claim the US |
|
01-06-2000 |
THIR |
CALVERT CLIFFS, USA LEVENSDUURVERLENGING NRC OCONEE, SC, USA VERGUNNINGEN VS |
Excelon forges ahead with US license renewals |
|
01-08-2001 |
NEW |
EXELON CORPORATION KOSTEN VERGELIJKING LEVENSDUURVERLENGING NRC PEACH BOTTOM, USA VERGUNNINGEN VS |
Exelon nuclear submits license renewal application for Peach Bottom atomic power |
|
01-12-2001 |
EFMR |
ARKANSAS NUCLEAR ONE CALVERT CLIFFS, USA EXELON CORPORATION LEVENSDUURVERLENGING LOBBY BEDRIJVEN NRC OCONEE, SC, USA PEACH BOTTOM, USA VERGUNNINGEN VS WERKGELEGENHEID |
FirstEnergy Nuclear Operating Co's application to renew the operating licences |
|
23-03-2005 |
WNAN |
BEAVER VALLEY, USA LEVENSDUURVERLENGING NRC VERGUNNINGEN VS |
Florida Power Corp can uprate its Crystal River-3 |
|
04-12-2002 |
WNAN |
BELANG KE IN ENERGIEPRODUCTIE CRYSTAL RIVER, VS ENTERGY CORPORATION FLORIDA POWER&LIGHT LEVENSDUURVERLENGING VERGUNNINGEN VERMONT YANKEE, USA VS |
Further US licence extension |
NRC 8/11/06 |
10-11-2006 |
UICW |
LEVENSDUURVERLENGING MONTICELLO, USA NRC VERGUNNINGEN VS |
Further US licence extensions |
NRC 28/11/05 |
02-12-2005 |
UICW |
LEVENSDUURVERLENGING MILLSTONE, CONN. USA VERGUNNINGEN VS |
Further US licence renewal |
|
07-11-2003 |
UICW |
FORT CALHOUN, USA LEVENSDUURVERLENGING NRC VERGUNNINGEN VS |
Further US licence renewals |
|
12-12-2003 |
UICW |
CATAWBA, USA LEVENSDUURVERLENGING MCGUIRE NRC VERGUNNINGEN VS |
Further US licence renewals |
NRC 4/5/06 |
12-05-2006 |
UICW |
BROWNS FERRY, USA LEVENSDUURVERLENGING NRC OPSTARTEN VERGUNNINGEN VS |
Further US licence renewals |
NucNet # 201/05 |
30-12-2005 |
UICW |
LEVENSDUURVERLENGING NRC POINT BEACH, VS VERGUNNINGEN VS |
In brief: US license renewal: Hatch, Duke |
|
01-02-2002 |
NMNA |
AKB HATCH HERGEBRUIK HOORZITTINGEN LEVENSDUURVERLENGING MOX RECHTZAKEN VERGUNNINGEN VS |
Large US reactor to be recommissioned |
NucNet news # 176/02, Us Weekly 20/5/02 |
24-05-2002 |
UICW |
BOUW VAN KERNCENTRALE BROWNS FERRY, USA KOSTEN KERNENERGIE LEVENSDUURVERLENGING OPSTARTEN SLUITEN TVA VERGUNNINGEN VS |
Legal challenge to US MOX boiling on two fronts |
Mary Olson |
01-01-2002 |
NMNA |
AKB ATOOMTERRORISME BRANDSTOF FABRICAGE BROEIKASEFFECT DIEFSTAL/VERMISSING HOORZITTINGEN LEVENSDUURVERLENGING MILIEUGROEPEN MOX NRC PLUTONIUM PLUTONIUM OPSLAG PROLIFERATIE RAMPENPLANNEN RECHTZAKEN SABOTAGE SAVANNAH RIVER STRALING GEVOLGEN VEILIGHEID ALGEMEEN VEILIGHEID-ONDERZOEK VERGUNNINGEN VS |
Licence renewal for further nuclear plant |
|
01-01-2002 |
UICN |
HATCH LEVENSDUURVERLENGING VERGUNNINGEN VS |
Licence renewal for further nuclear plant |
NucNet news # 14/02 |
01-02-2002 |
UICN |
BWR EDWIN I HATCH, USA LEVENSDUURVERLENGING NRC VERGUNNINGEN VS |
Licence renewals and uprates |
|
01-11-2003 |
WNA |
BELANG KE IN ENERGIEPRODUCTIE EDWIN I HATCH, USA FORT CALHOUN, USA LEVENSDUURVERLENGING PALO VERDE, USA ST.LUCY VERGUNNINGEN VS |
Maryland: Baltimore Gas & Electric has announced that it will |
|
01-02-1998 |
NM |
BALTIMORE GAS & ELEC CALVERT CLIFFS, USA KOSTEN KERNENERGIE LEVENSDUURVERLENGING TECHNISCH ALGEMEEN VERGUNNINGEN VS |