Titel |
Auteur |
Datum |
Tijdschrift | categoriëen / verklein selectie |
A 2.8% power uprate - to 600 MWe - has been completed at the Duane Arnold |
|
22-06-2005 |
WNAN |
BELANG KE IN ENERGIEPRODUCTIE DUANE ARNOLD, USA ONDERHOUD EN REPARATIE SPLIJTSTOFWISSELING VS |
An incident involving accidental over exposure of an industrial radiographer |
|
24-05-2002 |
WNAN |
INES 3 IRIDIUM ONGELUKKEN REST VS |
ConverDyn's Metropolis conversion facility |
|
17-09-2003 |
WNAN |
CONVERSIE NAAR UF6 METROPOLIS ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES UF-6 VS |
Entergy's Waterford nuclear power plant terminated the Unusual Event |
NRC, 8 and 9 September |
07-09-2005 |
WNAN |
KERNENERGIE EN MILIEU ONDERHOUD EN REPARATIE VS WATERFORD, VS |
FirstEnergy Corp has raised its projection |
|
30-07-2003 |
WNAN |
DAVIS-BESSE KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE VS |
FirstEnergy has lowered temperature and pressure levels at the Davis-Besse |
|
07-01-2004 |
WNAN |
DAVIS-BESSE ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES VS |
FirstEnergy Nuclear Operating Co has applied to the NRC for permission o restart |
|
18-02-2004 |
WNAN |
DAVIS-BESSE KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE VS |
FirstEnergy Nuclear Operating Co has been authorised to restart |
|
03-03-2004 |
WNAN |
DAVIS-BESSE ONDERHOUD EN REPARATIE OPSTARTEN VS |
FirstEnergy will begin the process of gaining approval |
|
12-11-2003 |
WNAN |
DAVIS-BESSE NRC ONDERHOUD EN REPARATIE OPSTARTEN VERGUNNINGEN VS |
Framatome ANP Inc-Areva's joint subsidiary with Siemens |
|
05-05-2004 |
WNAN |
FRAMATOME ANP CONTRACTEN ONDERHOUD EN REPARATIE SEQUOYAH, VS TECHNISCH ALGEMEEN TVA VS |
GE Energy's nuclear business has been awarded a multi-year, US$17 million |
GE Energy, 10 November |
09-11-2005 |
WNAN |
BWR EXELON CORPORATION GE - GENERAL ELECTRIC CONTRACTEN ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VS |
Modifications to return the Browns Ferry-1 nuclear power reactor |
|
19-02-2003 |
WNAN |
BROWNS FERRY, USA KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE TVA VS |
Nine nuclear power reactors shut down automatically |
|
13-08-2003 |
WNAN |
CANADA ELECTRICITEIT FERMI, USA FITZPATRICK INDIAN POINT, USA NINE MILE POINT, USA ONDERHOUD EN REPARATIE OYSTER CREEK, NJ,USA PERRY, OHIO, USA ROBERT E GINNA, USA VS |
Pacific Gas & Electric Co (PG&E) has been authorized |
Nucleonics Week, 19 November |
23-11-2005 |
WNAN |
DIABLO CANYON - USA LEVENSDUURVERLENGING ONDERHOUD EN REPARATIE VS |
Plans to replace steam generators at the San Onofre-2 and -3 |
PUC, 15 December |
21-12-2005 |
WNAN |
KOSTEN KERNENERGIE LEVENSDUURVERLENGING ONDERHOUD EN REPARATIE SAN ONOFRE, USA VS |
PSEG Nuclear decided to take both units at its Salem nuclear Power Plant offline |
|
01-12-2004 |
WNAN |
HOPE CREEK, NJ, USA ONDERHOUD EN REPARATIE SALEM, NJ, USA VEILIGHEID REACTOR VS |
PSEG Nuclear LLC has awarded a contract for maintenance and modifications |
Shaw, 12 April |
12-04-2006 |
WNAN |
HOPE CREEK, NJ, USA CONTRACTEN ONDERHOUD EN REPARATIE SALEM, NJ, USA VS |
Shareholders in British Energy (BE) have approved the sale |
|
17-12-2003 |
WNAN |
AMERGEN BRITISH ENERGY EXELON CORPORATION GROOT BRITANNIË HEYSHAM, GB ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES OVERNAME VS |
Surplus Us weapons-origin fuel is to be used at Tennessee Valley Authority's |
|
23-02-2005 |
WNAN |
BRANDSTOF FABRICAGE BROWNS FERRY, USA DOE - USA HOOG VERRIJKT U (HEU) CONTRACTEN ONDERHOUD EN REPARATIE TVA VS |
The Nuclear Regulatory Commission (NRC) and Honeywell international |
|
24-12-2003 |
WNAN |
METROPOLIS NRC ONDERHOUD EN REPARATIE UF-6 VS |
The Nuclear Regulatory Commission (NRC) is working closely with operators |
|
24-08-2005 |
WNAN |
GRAND GULF, USA NRC ONDERHOUD EN REPARATIE RIVER BEND, USA VEILIGHEID REACTOR VS WATERFORD, VS |
The reactor pressure vessel (RPV) head at Progress Energy's Robinson-2... |
Nucleonics Week, 4 Sep, p3; Ux Weekly, 8 September, p4 |
03-09-2003 |
WNAN |
H.B.ROBINSON, USA INSPECTIES KOSTEN KERNENERGIE NRC ONDERHOUD EN REPARATIE VEILIGHEID REACTOR VS |
The reactor vessel heads will be replaced at five nuclear power reactors |
|
07-01-2004 |
WNAN |
KEWAUNEE, USA ONDERHOUD EN REPARATIE POINT BEACH, VS PRAIRIE ISLAND, USA TECHNISCH ALGEMEEN VS WESTINGHOUSE |
The South Texas-1 nuclear power reactor has received permission |
|
30-07-2003 |
WNAN |
KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES OPSTARTEN SOUTH TEXAS, USA VS |
The South Texas-1 nuclear power reactor was back online |
|
13-08-2003 |
WNAN |
ONDERHOUD EN REPARATIE OPSTARTEN SOUTH TEXAS, USA VS |
The US should rejoin the International Thermonuclear Experimental Reactor ... |
NucNet News, 297/02 |
24-09-2002 |
WNAN |
CANADA EU / EEG ITER JAPAN KERNFUSIE RUSLAND VS |
US: An 8% uprate of FirstEnergy's two-unit Beaver Valley... |
NRC, 20 July |
19-07-2006 |
WNAN |
BEAVER VALLEY, USA FIRST ENERGY (FENOC) ONDERHOUD EN REPARATIE VS |
US: Detroit Edison plans to spend some US$80 million to add 150 MWe... |
Nucleonics Week, 4 September, p4 |
03-09-2003 |
WNAN |
BWR FERMI, USA KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE VS |
US: The Nuclear Regulatory Commision (NRC) expects 12 new applications ... |
Nucleonics Week, 15 July, p3 |
14-07-2004 |
WNAN |
BELANG KE IN ENERGIEPRODUCTIE ONDERHOUD EN REPARATIE VS |
US: The Nuclear Regulatory Commission (NRC) will require annual assessments... |
Nuclear Market Review, 29 February, p3; Nuclear Energy Ov... |
25-02-2004 |
WNAN |
DAVIS-BESSE INSPECTIES NRC ONDERHOUD EN REPARATIE OPSTARTEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VERGUNNINGEN VS |