Titel |
Auteur |
Datum |
Tijdschrift | categoriëen / verklein selectie |
1989 ushers in serious mishaps at reactors across country |
|
20-03-1989 |
NM |
DUANE ARNOLD, USA INDIAN POINT, USA LA SALLE, USA MCGUIRE NORTH ANNA, USA ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES PALO VERDE, USA STRALING METINGEN TECHNISCH ALGEMEEN VS |
California: the nation's largest private utility, Pacific Gas & Electric (PG&E) |
|
11-03-1991 |
NM |
DIABLO CANYON - USA ELEKTRICITEITSBEDRIJVEN LOBBY BEDRIJVEN ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VS |
Canada: Ontario Hydro closed seven of its 19 reactors |
|
01-10-1997 |
NM |
CANADA KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE ONTARIO HYDRO TECHNISCH ALGEMEEN |
Centerior Energy's Perry reactor was the 100th plant licensed in the U.S. |
|
03-12-1990 |
NM |
ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES PERRY, OHIO, USA TECHNISCH ALGEMEEN VS |
Connecticut: "Low-Level" radioactive waste is just gloves and booties? |
|
24-02-1992 |
NM |
AFVAL ALGEMEEN AFVAL TRANSPORT MILLSTONE, CONN. USA ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VS |
Cracks found in Brunswick reactor vessel shroud |
|
04-10-1993 |
NM |
BRUNSWICK, USA CENSUUR NRC ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES TECHNISCH ALGEMEEN VS |
Cracks found in Oyster Creek core shroud |
|
21-11-1994 |
NM |
AKB NRC ONDERHOUD EN REPARATIE OYSTER CREEK, NJ,USA TECHNISCH ALGEMEEN VEILIGHEID-ONDERZOEK VS |
Detroit Edison lambasted by NRC, INPO, Lawrence Livermore |
|
21-09-1987 |
NM |
FERMI, USA INPO NRC ONDERHOUD EN REPARATIE OPSTARTEN TECHNISCH ALGEMEEN VEILIGHEID REACTOR VEILIGHEID-ONDERZOEK VERGUNNINGEN VS |
Detroit Edison's Fermi-2 November 25 shut down for what may be |
|
03-12-1990 |
NM |
FERMI, USA ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS |
Fermi restart delayed as Detroit Edison orders internal audit |
|
10-02-1986 |
NM |
FERMI, USA ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VEILIGHEID-ONDERZOEK VS |
Fermi restart stalls; protests emerge over exemption request |
|
11-08-1986 |
NM |
FERMI, USA NRC ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES OPSTARTEN TECHNISCH ALGEMEEN VEILIGHEID-ONDERZOEK VS WETGEVING |
Florida Power & Light plans to close its two-unit Turkey Point |
|
27-11-1989 |
NM |
CENSUUR FLORIDA POWER&LIGHT KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN TURKEY POINT, USA VS WERKNEMERS |
Former U.S. nuke engineer finds fault with power increase Vermont Yankee reactor |
The Provindence Journal, 19 August 2003 |
22-08-2003 |
NM |
ENTERGY CORPORATION LEVENSDUURVERLENGING ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VERMONT YANKEE, USA VS WERKNEMERS |
Illinois: Commonwealth Edison's troubled nuclear power program |
|
01-01-1997 |
NM |
BYRON, USA COMMONWEALTH EDISON, VS LA SALLE, USA ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS |
Indiana & Michigan Power has applied to the NRC for permission |
|
16-05-1988 |
NM |
DONALD C COOK, USA ONDERHOUD EN REPARATIE RADIOACTIEF SCHROOT TECHNISCH ALGEMEEN VS |
Ines 2 accident at Kozloduy |
(647.5754) WISE brno |
30-06-2006 |
NM |
BELENE, BULGARIJE BOUW VAN KERNCENTRALE BULGARIJE CENSUUR FINANCIERING INES 2 KOZLODUY, BULGARIJE ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES POLITIEK EN BELEID TECHNISCH ALGEMEEN TENTOONSTELLING |
McGuire accidents raises new concerns about intersystem locas |
|
18-09-1989 |
NM |
MCGUIRE ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES TECHNISCH ALGEMEEN VS |
Meanwhile, the nation's most heavily fined plant just can't seem |
|
05-10-1987 |
NM |
FERMI, USA ONDERHOUD EN REPARATIE ONGELUKKEN KERNCENTRALES TECHNISCH ALGEMEEN VS WETGEVING |
Michigan: American Electric Power (AEP) announced |
|
01-01-1999 |
NM |
DONALD C COOK, USA ONDERHOUD EN REPARATIE OPSTARTEN TECHNISCH ALGEMEEN VS |
Michigan: at the Palisades plant on Lake Michigan |
|
08-10-1990 |
NM |
AFVAL DROGE INTERIM KOSTEN KERNENERGIE ONDERHOUD EN REPARATIE PALISADES, USA TECHNISCH ALGEMEEN VS |
Michigan: the Palisades reactor has begun an early refueling outage |
|
24-02-1992 |
NM |
ONDERHOUD EN REPARATIE PALISADES, USA TECHNISCH ALGEMEEN VS |
Nebraska: the Fort Calhoun reactor was forced to shut down September |
|
23-09-1991 |
NM |
FORT CALHOUN, USA NINE MILE POINT, USA ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS |
New Jersey: General Public Utilities (GPU) Oyster Creek reactor |
|
17-10-1994 |
NM |
AFVAL DROGE INTERIM GPU ONDERHOUD EN REPARATIE OYSTER CREEK, NJ,USA TECHNISCH ALGEMEEN VS |
NRC denies UCS petition to shut down Babcock & Wilcox reactors |
|
16-11-1987 |
NM |
BABCOCK AND WILCOX NRC ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN UCS VEILIGHEID REACTOR VS |
NRC examining charges that Maine Yankee falsified documents |
|
25-12-1995 |
NM |
CENSUUR MAINE YANKEE, USA NRC ONDERHOUD EN REPARATIE ONDERZOEK TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS |
NRC indicates major concern over loss of decay heat removal |
|
14-11-1988 |
NM |
DIABLO CANYON - USA NRC ONDERHOUD EN REPARATIE PWR TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS |
NRC to Indian Point-2: regulations were made for exemptions |
|
05-09-1988 |
NM |
INDIAN POINT, USA KOELTORENS ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN VEILIGHEID REACTOR VS |
NRR notes continued poor operations at Rancho Seco |
|
08-09-1986 |
NM |
NRC ONDERHOUD EN REPARATIE RANCHO SECO, USA TECHNISCH ALGEMEEN VEILIGHEID-ONDERZOEK VS |
Oregon: Portland General Electric's Trojan reactor has been shut |
|
04-11-1991 |
NM |
LOBBY BEDRIJVEN ONDERHOUD EN REPARATIE TECHNISCH ALGEMEEN TROJAN VS |
Public citizen finds lengthy outages may decrease performance |
|
13-06-1988 |
NM |
BEAVER VALLEY, USA BELANG KE IN ENERGIEPRODUCTIE BROWNS FERRY, USA DAVIS-BESSE DRESDEN, USA FORT ST VRAIN, USA HUMBOLDT BAY, USA INDIAN POINT, USA KOSTEN KERNENERGIE NINE MILE POINT, USA ONDERHOUD EN REPARATIE OYSTER CREEK, NJ,USA PEACH BOTTOM, USA PILGRIM, MASS. USA SAN ONOFRE, USA SEQUOYAH, VS ST.LUCY SURRY, USA TECHNISCH ALGEMEEN TMI TURKEY POINT, USA VS |