de Laka-catalogus

nr titel auteur datum
6.03.1.30/73Number and types of facilities under Agency safeguards by State during 2019IAEA mei 2020
6.03.1.30/72The Safeguards Implementation Report for 2019IAEA mei 2020
6.03.1.30/71Het vraagstuk van de niet-verspreiding van kernwapens en de controle op het vreedzame gebruik van kernenergie. Tweede interim rapportAdviescommissie inzake vraagstukken van ontwapening en internationale veiligheid en vrede 1967
6.03.1.30/70Review in progress in Safeguards Development. No. 2IAEA juni 1973
6.03.1.30/69Review in progress in Safeguards Development. No. 1IAEA april 1971
6.03.1.30/68International safeguards of nonmilitary nuclear technologyT.B.Taylor januari 1969
6.03.1.30/67Falling behind: international scrutiny of the peaceful atom.H.Sokolski februari 2008
6.03.1.30/66Subsidiary arrangements to the agreement between the government of [...] and the International Atomic Energy Agency for the application of safeguards in connection with the Treaty on the Non-Proliferation of Nuclear Weapons. Secretariat draft. Fifth revisionIAEA 1974
6.03.1.30/65Analysis of some available data on Material Unaccounted For (MUF). KFK 1106H.Singh april 1971
6.03.1.30/64Safeguards Agreement under NPT between [ ] and the IAEA. M-10 (Conversion Plant with Three Parallel Process Areas)IAEA september 1976
6.03.1.30/63Safeguards Agreement under NPT between [ ] and the IAEA. M-09 (Fuel fabrication plant with three parallel process areas)IAEA oktober 1976
6.03.1.30/62Safeguards Agreement under NPT between [ ] and the IAEA. M-08 (Subcritical assembly)IAEA september 1976
6.03.1.30/61Safeguards Agreement under NPT between [ ] and the IAEA. M-07 (Miscellaneous locations)IAEA september 1976
6.03.1.30/60Safeguards Agreement under NPT between [ ] and the IAEA. M-06 (Research reactor IRT/VVR-S)IAEA september 1976
6.03.1.30/59NPT Agreement between [ ] and the IAEA. M-05 (Candu reactors - multiple units)IAEA november 1976
6.03.1.30/58Safeguards Agreement under NPT between [ ] and the IAEA. M-04 (Research Facility Handling Bulk Material of less than 5 ekg Throughput)IAEA oktober 1976
6.03.1.30/57Safeguards Agreement under NPT between [ ] and the IAEA. M-03 (Fuel Fabrication Plant with one process MBA only)IAEA oktober 1976
6.03.1.30/56Safeguards Agreement under NPT between [ ] and the IAEA. LWR with spent fuel stored for a year or longer, with pin exchange. M-02 (D)IAEA augustus 1976
6.03.1.30/55Safeguards Agreement under NPT between [ ] and the IAEA. LWR with spent fuel stored for a year or longer, without pin exchange. M-02 (C)IAEA augustus 1976
6.03.1.30/54Safeguards Agreement under NPT between [ ] and the IAEA. LWR with spent fuel stored less than one year, with pin exchange. M-02 (B)IAEA augustus 1976
6.03.1.30/53Safeguards Agreement under NPT between [ ] and the IAEA. LWR with spent fuel stored less than one year, without pin exchange. M-02 (A)IAEA augustus 1976
6.03.1.30/52Safeguards Agreement under NPT between ... and the IAEA. M-01 (Triga Research Reactor)IAEA september 1976
6.03.1.30/51The Agency's safeguards system (1965, as provisionally extended in 1966 and 1968). INFCIRC/66/Rev.2IAEA september 1968
6.03.1.30/50The Agency's safeguards system (1965, as provisionally extended in 1966). INFCIRC/66/Rev.1IAEA september 1967
6.03.1.30/49Technical options for plutonium safeguardsAtomic Industrial Forum 1977*
6.03.1.30/48Report to the director-general of the International Atomic Energy Agency by the Consultants on criteria for safeguards proceduresIAEA 1969
6.03.1.30/47Safeguards technical development (Progress report 1967)IAEA mei 1967
6.03.1.30/46The physical protection of nuclear material. INFCIRC/225 (corrected)IAEA februari 1976
6.03.1.30/45Report forms and explanations for their useIAEA april 1977
6.03.1.30/44The safeguards implementation report for 1977IAEA juni 1978

*: Geschatte datum