date | INES | title | location |
24-08-2021 | INES 2 | External contamination of a worker leading to exceeding of the regulatory annual limit for the equivalent dose to the skin | CRUAS-2, France |
09-10-2020 | INES 2 | Discovery of legacy radioactive sources and residual contamination | University Hospitals of Strasbourg, France |
11-12-2020 | INES 2 | Hands skin exposure | Wales, F-18 Radio-pharmacy, United Kingdom |
20-07-2021 | INES 2 | Overexposure of two workers | OCA ICP, Madrid, Spain |
22-07-2021 | INES 2 | Automatic trip of both reactors following loss of off-site electric supplies | Heysham 1 Power Station, United Kingdom |
22-07-2021 | INES 2 | Automatic trip of both reactors following loss of off-site electric supplies | Heysham 1 Power Station, United Kingdom |
10-01-2022 | INES 2 | Higher dose rate in an operating area due to inappropriate positioning of a Co-60 source | Institute of Isotopes Ltd. Budapest, Hungary |
23-11-2021 | INES 2 | Exposure of workers in excess of statutory annual dose limits | Norrköping, Sweden |
08-12-2021 | INES 2 | Equivalent dose for extremities (hand) exceeding statuary annual limits | Hospital, North Rhine-Westphalia, Germany, Germany |
05-05-2022 | INES 2 | Exposure of industrial radiographer | Antwerp Region, Belgium |
24-03-2022 | INES 2 | Exposure of radiographer over annual statutory dose limit | BorsodChem Co. Ltd, Hungary |
19-05-2021 | INES 2 | Exposure of a worker over annual statutory dose limit | Hungary, Hungary |
25-05-2022 | INES 2 | Exposure of a worker in excess of the statutory dose limit | Sellafield Ltd. UK, United Kingdom |
31-10-2022 | INES 2 | Exposure of a worker in excess of the statutory dose limit | Aperam Stainless Steel France, France |
02-02-2023 | INES 2 | External contamination of a worker leading to exceeding of the annual statutory dose limit | CATTENOM-3, France |
06-03-2023 | INES 2 | Stress corrosion: presence of a deep crack on the safety injection system of reactor 1 of the Penly NPP | PENLY-1, France |
21-07-2022 | INES 2 | Contamination of an employee and the break room in a nuclear medicine department | SCINTIGARD radiology centre (Nîmes), France |
24-09-2023 | INES 2 | Worker Exceeded Statuary Annual Whole Body Dose Limits | Machine Factory, Baden-Württemberg, Germany |
31-12-2019 | INES 2 | Radon Exposure at Boarding School | Kingswood School, Bath, United Kingdom |
02-01-2002 | INES 3 | High radiation levels measured on a package containing Iridium-192 | Studsvik Nuclear AB, Sweden |
10-04-2003 | INES 3 | Incremented radioactivity of the heat carrier during refueling outage at a time of fuel cleaning | PAKS-2, Hungary |
26-02-1991 | INES 3 | INOPERABILITY OF VALVES AT THE DISCHARGE SIDE OF HPSI PUMPS IN THREE TRAINS DUE TO FAILURE TO CONNECT POWER CABLES | KHMELNITSKI-1, Ukraine |
04-05-1991 | INES 3 | PERSONNEL OVEREXPOSURE DURING PRECOMMISSIONING OPERATIONS INVOLVING HOT CELL | IGNALINA-2, Lithuania |
10-04-1991 | INES 3 | UNAVAILABILITY OF LOW POWER EMERGENCY PROTECTION (LPEP) DUE TO LOSS OF IONIZATION CHAMBER POWER SUPPLY | CHERNOBYL-1, Ukraine |
12-05-1991 | INES 3 | RELEASE OF ACTIVE LIQUID FROM STORAGE TANK | BOHUNICE-1, Slovakia |
10-07-1991 | INES 3 | RADIOACTIVE WATER SPILLAGE ON THE PLANT TERRITORY WHILE TRANSPORTING CASK WITH FUEL FRAGMENTS TO THE DRY RADWASTE REPOSITORY | BILIBINO GEN, Russian Federation |
22-07-1991 | INES 3 | BREACH OF UNIT LIMITING CONDITIONS FOR OPERATION WHILE PREPARING FOR RESTART AFTER MAINTENANCE DUE TO ECCS AND MSV UNAVAILABILITY | SMOLENSK-2, Russian Federation |
08-09-1992 | INES 3 | PLUTONIUM NITRATE LEAK IN CELL | BNFL, Sellafield, United Kingdom |
02-02-1993 | INES 3 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-1, Russian Federation |
02-02-1993 | INES 3 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-2, Russian Federation |