Publication Laka-library:
Strategy. Nuclear Decommissioning Authority . (2006)
| Author | NDA |
| Date | March 2006 |
| Classification | 2.05.4.10/65 (UNITED KINGDOM - WASTE - NIREX/NDA DECOMMISIONING) |
| Front | ![]() |
From the publication:
Introduction and context The NDA is a non-departmental public body, set up in April 2005 under the Energy Act 2004. Our remit includes the development of this Strategy. We are required to review our Strategy at least once every five years. However, we are likely to undertake a review starting in the second half of 2006 to take account of, in particular, the outcome of the CoRWM (Committee on Radioactive Waste Management) process and the Low Level Waste (LLW) policy review - both of which are fundamentally important to our Strategy. Our core objective is to ensure that the 20 civil public sector nuclear sites are decommissioned and cleaned up safely, securely, cost-effectively and in ways that protect the environment for this and future generations. We are also required to operate existing commercial plant effectively and efficiently until current contracts have been met and to generate income to offset the cost to taxpayers of decommissioning and clean-up. The nuclear legacy that we have inherited represents about 85% of the UK's civil nuclear liabilities and is wholly the responsibility of the Government. It includes: • the nuclear sites and facilities which were developed in the 1940s, 1950s and 1960s to support the Government's research programmes, and the wastes, materials and spent fuels produced by these programmes; and • the Magnox fleet of nuclear power stations built in the 1960s and 1970s and plant and facilities at Sellafield used for the reprocessing of Magnox fuel; and all associated wastes and materials. The NDA operates in partnership with a number of key stakeholders. We are responsible to the Secretary of State for Trade and Industry and to the Scottish Ministers; we are funded by the Government; we have initial contracts with Site Licence Companies (SLCs) - British Nuclear Group Sellafield Ltd, Magnox Electric Ltd, Springfields Fuels Ltd and the United Kingdom Atomic Energy Authority (UKAEA) - to deliver agreed programmes of work to schedule and within agreed site funding limits; and we work closely with the regulators and local communities. In developing this Strategy, we undertook an environmental assessment of the various options considered and we published jointly for consultation both our Draft Strategy and an Environmental Report. Both are available on our website www.nda.gov.uk and in hard copy.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

