Publication Laka-library:
Nuclear Energy in the North West (1986)
| Author | AKAEA-Northern Division |
| Date | 1986 |
| Classification | 2.05.9.90/01 (UNITED KINGDOM - OTHER FACILITIES) |
| Front | ![]() |
From the publication:
The North West Nuclear Energy Plants and Pioneers Risley 1946 In 1946 Mr. Christopher Hinton Hater Lord Hinton of Bankside) was chosen to direct a new Atomic Energy Production Division of the Ministry of Supply. His instructions were to build factories to carry out four main processes - to extract uranium metal or uranium hexafluoride from ore concentrates; to irradiate the metal in nuclear piles; to extract plutonium from the irradiated metal and refine it; and to separate Uranium 235 by diffusion. Springfields 1946 A paramount consideration of the new Production Division was to get uranium production going as quickly as possible and the Risley engineers decided that much time would be saved if the plant could be built in one of the factories put up during the war to manufacture munitions. An examination of the factories available led to the choice of Springfields as being the one which best met the requirements. Windscale 1947 For the operation of plutonium-producing piles and for chemical reprocessing of the irradiated fuel to separate the plutonium from the depleted uranium and the fission products a new atomic energy site was established at Windscale. Capenhurst 1949 A new atomic energy site at Capenhurst, Cheshire, for the production, by gaseous diffusion, of uranium enriched in the naturally occurring fissile isotope uranium 235 was announced in 1949. Calder Hall 1953 Construction work began in 1953 on the world's first industrial-scale nuclear power station at Calder Hall, Cumbria, adjacent to the Windscale site. The original plans were for two reactors with a turbine hall between and two large cooling towers at one end, this now being known as the Calder 'A' station. Windscale Advanced Gas-Cooled Reactor (AGR) 1957 The Atomic Energy Authority started work on the AGR system in 1957 within a year of raising power on the first Calder Hall reactor. Construction of the experimental AGR on the Windscale site started in November 1958, and criticality was achieved in August 1962. Heysham Nuclear Power Station 1983 Arising from the developments by the UKAEA, the CEGB (NW Region) own and operate four nuclear power stations. Two Magnox stations are located at Wylfa and Trawsfynydd in North Wales. At 840 MW output, Wylfa is the largest and the last of the Magnox stations.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

