From the publication:
MAINE YANKEE MILESTONES 1966 January 3 Announcement of formation of Maine Yankee Atomic Power Co. 1966 May 19 Plant location announced as Bailey Point, Wiscasset, Maine 1967 Autumn Site preparation work begun 1968 March 11 Site excavation work begun 1968 October 21 Construction permit issued by AEC, heavy construction begun 1972 September 15 Construction complete - AEC issues operating license authorizing 75% maximum capacity 1972 September Fuel loading 1972 October 23 Initial criticality 1972 December 28 Start of commercial operation 1973 June 29 Granted 100% operating license by the U.S. Atomic Energy Commission 1975 August Underwater diffuser completed 1975 September Reached 10 billion KWH production mark 1976 June 9 Maine Yankee received Edison Award for outstanding contribution to the electric power industry 1977 June 10 Completed engineering modifications in plant's condenser increasing output by 12,000 KW 1977 December 28 Total output from plant reached nearly 23 billion KWH 1978 July 14 Established world records for most continuous days of operation (392) by a nuclear unit and most kilowatt-hours of electricity produced in one continuous run of operation (7 billion KWH) by a nuclear unit. 1978 December 31 Total output from the plant reached over 28 billion kilowatt-hours 1979 March 14 Plant was ordered shut down for reanalysis of safety related piping systems. Shutdown lasted until June 5. 1979 December 31 Total output from the plant reached nearly 33 billion kilowatt-hours 1980 December 31 Total output from the plant passed 37 billion KWH 1981 March 31 Generated highest monthly output 604,000,000 KWH since plant began operating.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.