Publication Laka-library:
Nuclear Power Costs And Subsidies (1979)
| Author | US GAO |
| Date | June 1979 |
| Classification | 6.01.0.10/27 (COSTS) |
| Front | ![]() |
From the publication:
REPORT BY THE Comptroller General OF THE UNITED STATES Nuclear Power Costs And Subsidies On October 23, 1978, Senator John Melcher asked GAO to identify, to the extent possible, the "full" cost of nuclear power. Such a cost mainly includes not only industry's costs, but also those borne by the Federal Government to promote or regulate the nuclear power industry. GAO found that the average commercial cost of electricity generated, by nuclear power-plants in the United States during 1978 was reported to be about 1.5 cents per kilowatt-hour, about the same as it was in 1977. Major Federal nuclear-related costs and subsidies for research and development, uranium enrichment, uranium exploration, and regulation totaled about $1.7 billion during fiscal year 1978, an increase of about $274 million from fiscal year 1977. These costs, based on assumptions described in the report, were equal to 0.62 cents per kilowatt-hour during fiscal year 1978, and 0.57 cents during fiscal year 1977. Other Federal contributions to the nuclear industry described in the report were not quantifiable.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

