Capitalizing on BWR simplicity at lower power ratings (1986)
| Author | Duncan, Sawyer, Hucik |
| Date | 1986 |
| Classification | 6.01.2.30/10 (TECHNICAL - NUCLEAR POWER PLANTS) |
| Front | ![]() |
From the publication:
CAPITALIZING ON BWR SIMPLICITY AT LOWER POWER RATINGS J.D. Duncan, C.D. Sawyer, and S.A. Hucik Nuclear Energy Business Operations General Electric Company San Jose, California USA It has recently been argued that dramatically new reactor designs are needed to address such perceived nuclear industry shortcomings as product complexity, high cost and long construction periods. The currently available General Electric (GE) 1200 MWe BWR/6 is prelicensed (Nuclear Regulatory Commission Final Design Approval #1, received in 1983 and amended to allow new plant applications in 1985). This design and the large Advanced Boiling Water Reactor (ABWR, currently being applied in Japan) are available to meet the market needs. However, lower power ratings are being favorably discussed throughout the industry. The BWR/6 or ABWR could be offered with lower ratings if lower total plant costs are needed. Use of existing designs offers the advantage of low engineering costs compared to new product development costs and maximizes confidence that the resulting plant will perform well.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.