Titel: |
Decommissioning the nuclear power industry: rubble rubble, toil and trouble |
---|---|
Auteur | Gunter, Paul |
Beschrijving | achtergrond |
Datum | 1 February 2000 |
Pagina nummer | 5/17 |
Tijdschrift | Nuclear Monitor, Washington DC, VS |
Jaargang | 15 |
Nr | 2 |
Aantal pagina's | 6 |
Tags: | WASTE GENERAL - INTERIM AIRCOOLED WASTE STORAGE - dry storage INTERIM WATERCOOLED WASTE STORAGE - wet storage BWR - Boiling water reactor; including ABWR, SWR 1000 ESBWR EPA - Environmental Protection Agency, USA IODIN - COSTS NUCLEAR ENERGY - Atomic energy costs NRC - US: Nuclear Regulatory Commission DECOMMISSIONING - reactor decommissioning; incl. nuclear weapons PWR - Pressurized water reactor CLOSURE - finally closing a nuclear plant RADIATION PERMISSABLE LEVELS - GENERAL TECHNICAL INFORMATION - UNITED STATES OF AMERICA - United States YANKEE ROWE - Massachussets, USA |
Dit artikel is bij Laka aanwezig. U kunt een scan/kopie aanvragen.
« vorig artikel - volgend artikel »