Preliminary Ground Investigation report, Project KCB2, Borssele, The Netherlands

AuthorPaul C. Rizzo Associates INC., COVRA
1-01-8-25-11.pdf
DateJune 2013
Classification 1.01.8.25/11 (BORSSELE II - PZEM/DELTA - GENERAL)
Front

From the publication:

PRELIMINARY GROUND INVESTIGATION REPORT
PROJECT KCB2
BORSSELE, THE NETHERLANDS

REDACTED VERSION PREPARED FOR
CENTRALE ORGANISATIE VOOR RADIOACTIEF AFVAL (COVRA)

PROJECT NO. 10-4472
ALL CONTENT FROM REVISION 0
28 FEBRUARY 2012
PARTIAL REPORT PREPARED 13 JUNE 2013

PAUL C. RIZZO ASSOCIATES, INC.
PITTSBURGH, PENNSYLVANIA 15235 USA



PRELIMINARY GROUND INVESTIGATION REPORT
PROJECT KCB2

EXECUTIVE SUMMARY
A preliminary geological, geotechnical, and hydro-geological investigation has 
been completed by Paul C. Rizzo Associates, Inc. (RIZZO) to characterize the 
Borssele 2 Power Plant (KCB2) Site. The objective of the investigation was to 
provide sufficient site-specific information to the nuclear technology vendors 
to allow for their understanding of the ground risk in their bid preparation. 
The subsurface stratigraphy and properties of the subsurface materials have been 
determined using the results of the desk study, field, and laboratory data 
acquired during the investigation program. The preliminary ground investigation 
undertaken at the KCB2 Site included drilling five boreholes with a total depth 
of 600 meters (m), performing in-situ and laboratory geotechnical testing, and 
conducting borehole geophysical surveys. The investigation also consisted of 
developing ten Monitoring Wells grouped in three clusters to evaluate hydraulic 
properties.