From the publication:

SECTION 1
INTRODUCTION - BARSEBÄCK RISK ASSESSMENT

1.1 STUDY DESCRIPTION
This report documents the results of the Swedish Reactor Safety Study (SRSS) 
authorized by the Energikommissionen of Sweden and conducted by MHB 
Technical Associates with subcontracted contribution from Science Applications 
Incorporated (SAI).
The purpose of the SRSS is to prepare a risk assessment which compares the 
Swedish nuclear power plant design (Barsebäck 1 and 2) with U.S. reactor design 
(Peach Bottom 2), including investigation of possible failure modes and sequences 
which could lead to major radioactive releases. The results of the SRSS analysis are 
quantified to permit comparison with the U.S. Reactor Safety Study (WASH-1400).
The SRSS is a parallel study to the boiling water reactor (BWR) plant safety/risk 
review being conducted by AB Atomenergi under the direction of the Swedish 
Nuclear Power Inspectorate, SKI.

The MHB study has been divided into two phases. The objective of Phase A of the 
SRSS was (a) to evaluate the drawings and documents describing the Swedish 
reactor design, (b) to inspect a typical Swedish reactor facility, and (c) to assess 
briefly the implications of system design and safety features.

This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.