date INES title location
22-02-2015Not ApplicablePossible Flow of Contaminated Water to the Outside of the Controlled AreaFUKUSHIMA-DAIICHI
17-12-2014Not ApplicableLeakage of Water Treated by the Multi-Nuclide Removal Facility (ALPS)FUKUSHIMA-DAIICHI
17-09-2014Not ApplicableDiscovery of a Crack in a Connection Valve between Tanks for Concentrated Water Treated by Reverse OsmosisFUKUSHIMA-DAIICHI
02-06-2014Not ApplicableLeakage of Contaminated Water from Two Notch TanksFUKUSHIMA-DAIICHI
13-04-2014Not ApplicableInappropriate Transfer of Contaminated WaterFUKUSHIMA-DAIICHI
20-02-2014Not ApplicableLeakega of Contaminated Water from the Upper Part of Tank C-1 in H-6 Tank AreaFUKUSHIMA-DAIICHI
06-02-2014Not ApplicableLeakage of Contaminated Water from a Flange of Water Pressure Measuring instrumentFUKUSHIMA-DAIICHI
09-10-2013Not ApplicableLeakage of Contaminated Water from a Desalination SystemFUKUSHIMA-DAIICHI
02-10-2013Not ApplicableLeakege of Contaminated Water from the Top Plate of a Tank at B Area (South)FUKUSHIMA-DAIICHI
20-02-2014Not ApplicableLeakage of Contaminated Water from the Upper Part of Tank C-1 in H-6 Tank AreaFUKUSHIMA-DAIICHI
02-10-2013Not ApplicableLeakage of Contaminated Water from the Top Plate of a Tank at B Area (South)FUKUSHIMA-DAIICHI
15-09-2015Not ApplicableLeakages of water from the dikes in tank areas storing contaminated waterFUKUSHIMA-DAIICHI
29-05-2015Not ApplicableContaminated water being transferred to turbine building of unit 3 from 1000 tons notch tank was leaking from the cracked pressure hoseFUKUSHIMA-DAIICHI
20-04-2016Not ApplicableLeakage from Piping Transferring RO-Concentrated Water to G-6 Tank AreaFUKUSHIMA-DAIICHI
12-04-2011INES 7Re-evaluation of INES rating; Effect to the Nuclear Facilities from the earthquake on east area of JapanFukushima Daiichi
12-03-2011INES 5Abnormal rise of radioactive dosage value at site boundary (INES Level 4)FUKUSHIMA-DAIICHI-1
11-03-2011INES 5The core damage by loss of all cooling function due to the big tsunami.FUKUSHIMA-DAIICHI-3
11-03-2011INES 5The core damage by loss of all cooling function due to the big tsunami.FUKUSHIMA-DAIICHI-2
30-09-1999INES 4Workers exposed to radiation at conversion test building of JCO Co., Ltd., Tokai WorksJCO COMPANY, TOKAI
11-03-1997INES 3Fire and Explosion at the Bituminization Demonstration Facility of the Reprocessing PlantTOKAI REPROCESSING PLANT
11-03-2011INES 3Effect to the Nuclear Facilities from the earthquake on east area of JapanFUKUSHIMA-DAIICI-1,2 FUKUSHIMA-DAINI-1, Japan
11-03-2011INES 3Loss of cooling function and water supplying function on the spent fuel pool due to the big tsunami.FUKUSHIMA-DAIICHI-4
11-03-2011INES 3Loss of the cooling function to the ultimate heat sink due to the big tsunamiFUKUSHIMA-DAINI-4
11-03-2011INES 3Loss of the cooling function to the ultimate heat sink due to the big tsunamiFUKUSHIMA-DAINI-2
11-03-2011INES 3Loss of the cooling function to the ultimate heat sink due to the big tsunamiFUKUSHIMA-DAINI-1
19-08-2013INES 3Contaminated water leakage from a water tankFUKUSHIMA DAIICHI
29-05-2021INES 3Worker exposure to X-ray generatorSetouchi Works of Nippon Steel Corp., Hyogo Pref.
09-02-1991INES 2STEAM GENERATOR TUBE BREAKMIHAMA-2
27-12-1993INES 2RADIATION EXPOSURE OF WORKERS AT TOKAI REPROCESSING PLANTTOKAI REPROCESSING PLANT
18-06-1999INES 2Criticality accident during periodic inspectionSHIKA-1