Introduction and context

The NDA is a non-departmental public body, set up in April 2005 under the 
Energy Act 2004. Our remit includes the development of this Strategy.

We are required to review our Strategy at least once every five years. However, we 
are likely to undertake a review starting in the second half of 2006 to take account 
of, in particular, the outcome of the CoRWM (Committee on Radioactive Waste 
Management) process and the Low Level Waste (LLW) policy review - both of 
which are fundamentally important to our Strategy.

Our core objective is to ensure that the 20 civil public sector nuclear sites are 
decommissioned and cleaned up safely, securely, cost-effectively and in ways that 
protect the environment for this and future generations. We are also required to 
operate existing commercial plant effectively and efficiently until current contracts 
have been met and to generate income to offset the cost to taxpayers of 
decommissioning and clean-up.

The nuclear legacy that we have inherited represents about 85% of the UK's civil 
nuclear liabilities and is wholly the responsibility of the Government. It includes:

• the nuclear sites and facilities which were developed in the 1940s, 1950s and 1960s 
to support the Government's research programmes, and the wastes, materials and 
spent fuels produced by these programmes; and
• the Magnox fleet of nuclear power stations built in the 1960s and 1970s and plant 
and facilities at Sellafield used for the reprocessing of Magnox fuel; and all 
associated wastes and materials.

The NDA operates in partnership with a number of key stakeholders. We are 
responsible to the Secretary of State for Trade and Industry and to the Scottish 
Ministers; we are funded by the Government; we have initial contracts with Site 
Licence Companies (SLCs) - British Nuclear Group Sellafield Ltd, Magnox Electric 
Ltd, Springfields Fuels Ltd and the United Kingdom Atomic Energy Authority 
(UKAEA) - to deliver agreed programmes of work to schedule and within agreed site
funding limits; and we work closely with the regulators and local communities.

In developing this Strategy, we undertook an environmental assessment of the 
various options considered and we published jointly for consultation both our 
Draft Strategy and an Environmental Report. Both are available on our website 
www.nda.gov.uk and in hard copy.