Publicatie Laka-bibliotheek:
Underground exploration and testing at Yucca Mountain (1993)
| Auteur | NWTRB |
| Datum | oktober 1993 |
| Classificatie | 3.01.4.22/05 (VS - AFVAL - YUCCA MOUNTAIN) |
| Voorkant |
|
Uit de publicatie:
Executive Summary Underground exploration and testing are major components of the DOE's site- characterization efforts at Yucca Mountain, Nevada. During the past four years, the DOE's plans for exploration and testing in an underground facility have evolved substantially, and many improvements have been made. The DOE's current program involves extensive tunneling throughout the geologic block at Yucca Mountain with the goal of gaining visual access to the complex geology at the site. It is especially important to thoroughly understand the character and extent of the faults that cross the site, as well as the site's hydrogeology and geochemistry. Once tunnels have been excavated, scientists also will be able to initiate important tests, which are necessary to assess how the natural and engineered barriers will perform under conditions similar to those in a potential repository for hot spent fuel and high-level waste. Data gathered during these tests will be used to evaluate site suitability, to predict long-term performance of the entire repository system, and to support a license application - should the site prove suitable. In this report, the Board reviews the status of the underground exploration and testing program. In addition to a number of detailed recommendations, the Board makes three general recommendations, which are reviewed below. The Board would like to emphasize that all recommendations can and should be implemented without slowing the momentum of important site-characterization activities now under way at Yucca Mountain. The Board concurs with the overall objectives established by the DOE for underground exploration and testing at Yucca Mountain and supports many of the changes that have been made to the design of the facility. However, the Board remains concerned that, because of past delays in initiating underground exploration and attempts to comply with overly optimistic schedules, the DOE is making important technical decisions about the design and approach to excavation of the exploratory facility without sufficient analysis. Schedules have been compressed, and until recently the DOE had planned for multiple excavation operations from a single portal and simultaneous testing activities, which the Board believes would have extended, rather than shortened, program schedules and increased costs. The Board supports the DOE's recent decision to modify this approach by eliminating competing activities during excavation of the initial underground loop. Once this portal-to-portal loop has been completed, tunneling off the loop to fault zones, in the core test area, and in the Calico Hills can begin, and important testing initiated. The Board believes, however, that the Yucca Mountain project lacks an overall strategy for exploration and testing. To better achieve the objectives of the underground exploration and testing program, the Board recommends that the DOE develop a comprehensive strategy that integrates exploration and testing priorities with the design and excavation approach for the exploratory facility.
Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.