Nuclear Power Vol II-Nuclear Power Project Managements (1978)
| Auteur | Erik S.Pederson |
| Datum | 1978 |
| Classificatie | 6.01.2.30/05 (TECHNISCH - KERNCENTRALES) |
| Voorkant | ![]() |
Uit de publicatie:
PREFACE NUCLEAR POWER PROJECT MANAGEMENT is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The objective of the book is to give the reader an understanding of how a typical nuclear power project is planned and implemented-from preliminary design through final engineering and design, construction, startup and operation. Also included is a review of typical nuclear power plants, the licensing process, safeguard systems and safety analysis, quality assurance requirements and the steps necessary in deriving a QA plan and program, the nuclear fuel cycle and fuel management, and plant cost analysis. Much of the material contained is an outgrowth of lecture courses presented at leading organizations here and overseas. Rapidly changing technological developments in nuclear engineering, plus continuing changes in the regulatory and licensing procedures for nuclear power plants create a need for an organized information and know-how source on current developments in nuclear power technology. With the worldwide growth of nuclear power, the need for nuclear engineering technology and project management know-how is great. The engineering, design and construction of a nuclear power plant is a lengthy and complicated procedure involving the services and cooperation of many engineers, designers, technicians and others possessing specialized and varied knowledge and experience. A typical nuclear power plant project may have an overall schedule of 8 to 10 years from site selection, engineering, design, procurement and construction to plant startup. More than 300,people may be involved at the home project office, with as many as 2000 people in the field at the height of the construction phase. The cost of such a nuclear power plant built in the U.S. may run more than $800 million.
Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.