Publicatie Laka-bibliotheek:
Annual Report 2011: Operation and utilization of the High Flux Reactor

AuteurJoint Research Centre Petten
1-01-8-51-31.pdf
Datum2012
Classificatie 1.01.8.51/31 (OLP - HFR PETTEN)
Voorkant

Uit de publicatie:

Annual Report 2011
Operation and Utilisation of the High
Flux Reactor




                       2012




                                    Report EUR 25342 EN
European Commission
Joint Research Centre
Institute for Energy and Transport
Petten
The Netherlands

Contact information
Dr. Giovanni Federigo De Santi
Director
European Commission
DG JRC Institute for Energy (IE)
P.O. Box 2 1755 ZG Petten, The Netherlands
Email: giovanni.desanti@ec.europa.eu
Tel.: +31 224 56 565147
Fax: +31 224 56565601



http://iet.jrc.ec.europa.eu/
http://www.jrc.ec.europa.eu/


This publication is a Reference Report by the Joint Research Centre of the European Commission.

Legal Notice
Neither the European Commission nor any person acting on behalf of the Commission
is responsible for the use which might be made of this publication.


Europe Direct is a service to help you find answers to your questions about the European Union
Freephone number (*): 00 800 6 7 8 9 10 11
(*) Certain mobile telephone operators do not allow access to 00 800 numbers or these calls may be billed.


A great deal of additional information on the European Union is available on the Internet.
It can be accessed through the Europa server http://europa.eu/.




EUR 25342 EN


ISBN 978-92-79-25000-2 (pdf)
ISBN 978-92-79-24999-0 (print)
ISSN 1977-2289 / 1831-9424 (online)
ISSN 1830-5997 / 1018-5593 (print)

doi:10.2790/53636

Luxembourg: Publications Office of the European Union, 2012


© European Union, 2012

Reproduction is authorised provided the source is acknowledged.
Table of contents
HFR operation ............................................................................................................................ 4
  Operating schedule ................................................................................................................. 4
  Maintenance activities.........................................................................................................