Publicatie Laka-bibliotheek:
Analysis of estimated cost for 3 Pacific Northwest NPP (1979)
| Auteur | US GAO |
| Datum | juli 1979 |
| Classificatie | 3.01.8.40/02 (VS - LOCATIES - NOORD-WEST) |
| Voorkant |
|
Uit de publicatie:
REPORT BY THE U.S. General Accounting Office Analysis Of Estimated Cost For Three Pacific Northwest Nuclear Power Plants This report analyzes the cost estimates for three nuclear powerplants being constructed by Washington Public Power Supply System in the Pacific Northwest and compares their estimated cost with estimates made by Ebasco, a national nuclear engineering and construction firm. The large difference between the estimates is because -- differences exist in the base construction period used to calculate power cost for the Public Power System (1972-1981) versus Ebasco (1978-1990) and -- the Public Power System enjoys benefits as a publicly owned entity and can borrow capital at half the rate assumed by Ebasco for an investor-owned utility. The Public Power System's capital construction costs, however, are higher per unit than several investor-owned nuclear projects with comparable operating dates.
Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.