Concept of a Decommissioning Plan for Old Nuclear Power Reactors (2008)
| Auteur | Guiding Principles from NGOs |
| Datum | 2008 |
| Classificatie | 6.01.2.40/19 (ONTMANTELING) |
| Voorkant | ![]() |
Uit de publicatie:
Foreword The Concept comprises an introduction, two parts and several attachments. The Introduction presents main approaches, which, in the authors' opinion, can be used in working out the decommissioning strategy for Russian nuclear power units. The first part gives an analysis of the current situation in relation to the NPPs closure in Russia and other countries. A classification of nuclear reactors in terms of their safety and design peculiarities is given; stages and possible scenarios of decommissioning are presented. The second part discusses the problem of radioactive waste, spent nuclear fuel and legal regulation of the NPP decommissioning. The attachments describe the international experience and give legislative documents, which regulated the decommissioning of nuclear power units in Germany and Lithuania. The video-attachment to the Concept includes 4 documentaries. They illustrate Lithuanian and German experience on the decommissioning of power units, which had RBMK-1500 and VVER-440 reactors. The social, environmental and technological aspects of this experience are presented.
Deze publicatie is alleen op papier bij Laka beschikbaar, niet als pdf.
Publicaties zijn te leen of informeer of we een kopie kunnen maken. Soms, als we tijd hebben, lukt dat tegen kostprijs van de kopieën.