On May 2, 2005, the State of Texas Department of State Health Services received notification from a radiography licensee indicating that a radiographer may have received a whole body dose of 46.6 millisievert (mSv) or 4.6 rem during the period of March 20, 2005 through April 19, 2005. Based on previous dosimetry results, the individual’s annual cumulative dose is 63.95 mSv (6.4 rem), a dose in excess of the NRC’s annual occupational total effective dose equivalent limit of 50 mSv (5 rem).
The State of Texas is investigating the apparent overexposure, and the employee has been removed from working with radioactive material.
Behnam Raeesian is an internationally recognized visual artist and poster designer from Iran, known for bold political and cultural works. Through exhibitions, workshops, jury roles, and collaborations with cultural institutions worldwide, he has built a strong voice in contemporary political graphic design. His projects confront complex issues such as nuclear risk and technological impact, transforming […]
Everywhere you look, the nuclear industry’s hype machine is in overdrive. Goldman Sachs, Microsoft, and the UK government all tout small modular reactors as the silver bullet for climate change and energy security. Tech billionaires are hiring nuclear veterans. Wall Street is whispering about “round-the-clock power” for artificial intelligence data centers. For those old enough […]
Kernenergie en veiligheid: A wargame sought to test if a major radiological release that would prompt the evacuation of millions of civilians in South Korea could distract key US allies from assisting and rebuffing an all-out military invasion of Taiwan. The short answer was yes. The game originally presumed that China, wanting to keep the […]
Big batteries and EVs to the rescue again as faults with new nuclear plant cause chaos on Nordic grids The Finnish nuclear power plant Olkiluoto was finally connected to the grid last year, at an estimated cost of €11 billion compared to the original budget of €3 billion. That cost blowout forced its developer, the […]
A vast subsea nuclear graveyard planned to hold Britain’s burgeoning piles of radioactive waste is set to become the biggest, longest-lasting and most expensive infrastructure project ever undertaken in the UK. The project [UK's nuclear waste dump] is now predicted to take more than 150yrs to complete with lifetime costs of £66bn in today’s money...The […]