Europe: Germany

Legenda & explanation
date INES title location
24-09-2023INES 2Worker Exceeded Statuary Annual Whole Body Dose LimitsMachine Factory, Baden-Württemberg
08-12-2021INES 2Equivalent dose for extremities (hand) exceeding statuary annual limitsHospital, North Rhine-Westphalia, Germany
02-07-2020INES 2Radiation exposure of a worker beyond the statuary annual dose limitCompany for X-ray equipment, Bavaria
31-07-2020INES 2Organ equivalent dose exceeding statuary annual limitsCompany for measuring techniques, Bavaria
08-12-2020INES 2Radiation exposure of a hospital employee beyond the statuary annual dose limitLaboratory for radio-pharmaceutics in Bavaria
31-01-2020INES 2Radiation exposure of a hospital employee beyond the statuary annual dose limitHospital, Bavaria, Germany
29-11-2019INES 2Overexposure of two workers during radiographyCompany for non-destructive testing
11-01-2019INES 1Co60 source discovered in a scrap metal deliveryPort of Hamburg
12-12-2016INES 2Inadvertent damage of a Se-75 sourceDüsseldorf region
14-09-2013INES 3Overxposure of an industrial radiographerRefinery, Lingen
14-09-2013INES 3Overxposure of an industrial radiographerRefinery, Lingen
06-06-1998INES 2Unavailability of 1 out of 4 main steam safety and relief valve stationUNTERWESER
15-05-1997INES 2Discovery of a Cs-137 radiation source on a scrap yardMETAL FOUNDRY, HETTSTEDT
23-02-1995INES 0SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT BBIBLIS-B
01-11-1992INES 1INDICATIONS IN AUSTENITIC PIPING DISCOVERED DURING NON-DESTRUCTIVE TESTINGBRUNSBUETTEL
14-08-1991INES 0INTERNAL LEAKAGE OF PRESSURIZER SAFETY VALVESSTADE
05-07-1990INES 2INOPERABILITY OF NEUTRON FLUX MEASUREMENT DURING COLD SHUTDOWNGREIFSWALD-5
30-07-1990INES 0LEAKAGE IN THE UNDERGROUND TUBE OF THE INTERMEDIATE COOLING CIRCUITKRUEMMEL
23-02-1990INES 2REACTOR COOLANT LEAK ON THE WATER CLEANING SYSTEM WHILE CONNECTED TO THE PRIMARY CIRCUITGreifswald
14-12-2001INES 1DESTRUCTION OF A PIPING INSIDE CONTAINMENTBRUNSBUETTEL
10-08-2001INES 2Plant start up with too low levels in the borated water storage tanksPHILIPPSBURG-2
27-08-2001INES 2Boron concentration below specification in borated water storage tanks of 3 out of 4 ECCS trainsPHILIPPSBURG-2