date | INES | title | location |
08-12-2021 | INES 2 | Equivalent dose for extremities (hand) exceeding statuary annual limits | Hospital, North Rhine-Westphalia, Germany |
02-07-2020 | INES 2 | Radiation exposure of a worker beyond the statuary annual dose limit | Company for X-ray equipment, Bavaria |
31-07-2020 | INES 2 | Organ equivalent dose exceeding statuary annual limits | Company for measuring techniques, Bavaria |
08-12-2020 | INES 2 | Radiation exposure of a hospital employee beyond the statuary annual dose limit | Laboratory for radio-pharmaceutics in Bavaria |
31-01-2020 | INES 2 | Radiation exposure of a hospital employee beyond the statuary annual dose limit | Hospital, Bavaria, Germany |
29-11-2019 | INES 2 | Overexposure of two workers during radiography | Company for non-destructive testing |
11-01-2019 | INES 1 | Co60 source discovered in a scrap metal delivery | Port of Hamburg |
12-12-2016 | INES 2 | Inadvertent damage of a Se-75 source | Düsseldorf region |
14-09-2013 | INES 3 | Overxposure of an industrial radiographer | Refinery, Lingen |
14-09-2013 | INES 3 | Overxposure of an industrial radiographer | Refinery, Lingen |
06-06-1998 | INES 2 | Unavailability of 1 out of 4 main steam safety and relief valve station | UNTERWESER |
15-05-1997 | INES 2 | Discovery of a Cs-137 radiation source on a scrap yard | METAL FOUNDRY, HETTSTEDT |
23-02-1995 | INES 0 | SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT B | BIBLIS-B |
01-11-1992 | INES 1 | INDICATIONS IN AUSTENITIC PIPING DISCOVERED DURING NON-DESTRUCTIVE TESTING | BRUNSBUETTEL |
14-08-1991 | INES 0 | INTERNAL LEAKAGE OF PRESSURIZER SAFETY VALVES | STADE |
05-07-1990 | INES 2 | INOPERABILITY OF NEUTRON FLUX MEASUREMENT DURING COLD SHUTDOWN | GREIFSWALD-5 |
30-07-1990 | INES 0 | LEAKAGE IN THE UNDERGROUND TUBE OF THE INTERMEDIATE COOLING CIRCUIT | KRUEMMEL |
23-02-1990 | INES 2 | REACTOR COOLANT LEAK ON THE WATER CLEANING SYSTEM WHILE CONNECTED TO THE PRIMARY CIRCUIT | Greifswald |
14-12-2001 | INES 1 | DESTRUCTION OF A PIPING INSIDE CONTAINMENT | BRUNSBUETTEL |
10-08-2001 | INES 2 | Plant start up with too low levels in the borated water storage tanks | PHILIPPSBURG-2 |
27-08-2001 | INES 2 | Boron concentration below specification in borated water storage tanks of 3 out of 4 ECCS trains | PHILIPPSBURG-2 |