Asia: South Korea

Legenda & explanation
date INES title location
31-03-1996INES 0Reactor trip due to improper operation of main feedwater bypass valveKORI 1
22-08-1995INES 0REACTOR TRIP DUE TO LOSS OF 48V DC CONTROL POWERULCHIN-1
21-12-1993INES 0REACTOR TRIP DUE TO MAIN CONDENSER VACUUM LOW SIGNALKORI-2
03-04-1995INES 0REACTOR TRIP DUE TO MAIN FEEDWATER PUMPS STOPKORI-3
07-08-1995INES 0REACTOR TRIP DUE TO MALFUNCTION OF OPTICAL ISOLATORYONGGWANG-3
16-08-1995INES 0REACTOR TRIP DUE TO PRESSURE DROP OF INSTRUMENT AIRKORI 1
23-01-1996INES 0Reactor trip due to spurious signal generated by mistake of workerYONGGWANG-1
10-08-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR HIGH HIGH LEVEL SIGNALYONGGWANG-2
16-09-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR HIGH HIGH LEVEL SIGNALYONGGWANG-2
15-05-1996INES 0Reactor trip due to steam generator level low signalYONGGWANG-4
18-06-1996INES 0Reactor trip due to steam generator level low-low signalKORI-2
02-07-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR LOW LOW LEVEL SIGNALKORI 1
06-09-1995INES 0REACTOR TRIP DUE TO THE FAILURE OF CONTROL ROD SYSTEMYONGGWANG-3
19-06-1996INES 0Reactor trip due to the malfunction of optical isolatorYONGGWANG-4
10-07-1996INES 0Reactor trip due to the malfunction of optical isolatorYONGGWANG-4
23-11-1993INES 0REACTOR TRIP DUE TO TROUBLE OF DISCONNECTOR SWITCH IN SWITCH YARDULCHIN-1
06-12-1993INES 0REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNALKORI-3
25-09-1994INES 0REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNALKORI-2
13-07-1995INES 0SAFETY INJECTION DUE TO MAIN STEAM LINE LOW PRESSUREYONGGWANG-1
25-02-1995INES 0SAFETY INJECTION DUE TO PRESSURIZER SPRAY VALVE STACKKORI-2
05-04-2002INES 1Steam Generator Tube FailureULCHIN-4
03-12-1994INES 0TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLEYONGGWANG-1