date | INES | title | location |
28-06-1993 | INES 0 | RADIOACTIVE SPOT AT THE NPP SITE | ZAPOROZHE-1, Ukraine |
05-07-1993 | INES 0 | FIRE AT COOLING TOWERS | INR-PITESTI, Romania |
23-11-1993 | INES 0 | UNIT SCRAM DUE TO OPERATIONAL OCCURRENCE IN RCP COMPONENT COOLING CIRCUIT | KALININ-1, Russian Federation |
18-10-1993 | INES 0 | ACID SPILLAGE IN THORP | BNFL, Sellafield, United Kingdom |
18-01-1994 | INES 0 | REACTOR SHUTDOWN CAUSED BY THE LEAKAGE DETECTED IN ONE OF THE REACTOR BUILDING ROOMS | IGNALINA-1, Lithuania |
24-12-1993 | INES 0 | FIRE IN ELECTRIC TRANSFORMER | ALMARAZ-1, Spain |
27-01-1994 | INES 0 | MANUAL REACTOR SHUTDOWN CAUSED BY THE FAILURE OF THE MANUAL REACTOR CONTROL ROD SYSTEM | IGNALINA-2, Lithuania |
03-02-1994 | INES 0 | TURBINE TRIP AND REACTOR POWER DECREASE DUE TO FAILURE OF AUXILIARY TRANSFORMER AT NPP DUKOVANY | DUKOVANY-3, Czech Republic |
22-02-1994 | INES 0 | LEAKAGE OF FEEDWATER THROUGH WELDED JOINT OF A NB 76 PIPELINE CONNECTING ECCS HEADER WITH DISTRIBUTION GROUP HEADER | LENINGRAD-1, Russian Federation |
08-03-1994 | INES 0 | SHUNT TRANSFORMER INFLAMMATION AT THE HIGH-VOLTAGE (750 KW) LINE SWITCHYARD | ZAPOROZHE-1, Ukraine |
09-07-1994 | INES 0 | RELEASE OF IODINE 131 FROM THE TURBINE SYSTEM AT RINGHALS 1 | RINGHALS-1, Sweden |
08-07-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY SPURIOUS CLOSING OF THE GATE VALVE AT THE PIPELINE FEEDING THE MAIN CONDENSATE HEATER WITH HEATING STEAM | IGNALINA-2, Lithuania |
14-07-1994 | INES 0 | AUTOMATIC SHUT DOWN OF THE REACTOR AFTER GENERATOR PROTECTION ACTIVATION | KRSKO, Slovenia |
11-08-1994 | INES 0 | SLIGHT CONTAMINATION AT THE NUCLAR ELECTRICITY PRODUCTION CENTRE OF DAMPIERRE | DAMPIERRE-1, France |
21-08-1994 | INES 0 | REACTOR SHUTDOWN CAUSED BY LEAKAGE THROUGH A JOINT WELD IN THE ECCS PIPEWORK | IGNALINA-1, Lithuania |
22-08-1994 | INES 0 | ONE CONTROL ROD NOT FULLY INSERTED AFTER SCRAM | RINGHALS-4, Sweden |
09-08-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY GENERATOR TRIP | IGNALINA-1, Lithuania |
03-11-1994 | INES 0 | INFRINGEMENT OF THE REACTOR PRIMARY CIRCUIT INTEGRITY | IGNALINA-1, Lithuania |
06-03-1994 | INES 0 | DEPRESSURIZATION OF CONTROL ROD HOUSING DISCOVERED DURING ROUTINE INSPECTION | KOLA-3, Russian Federation |
04-12-1994 | INES 0 | LEAKAGE IN MANUAL VALVE INTO TECHNICAL SPECIFICATIONS | ALMARAZ-1, Spain |
23-02-1995 | INES 0 | SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT B | BIBLIS-B, Germany |
30-03-1995 | INES 0 | UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWER | KRSKO, Slovenia |
09-04-1995 | INES 0 | UNSUCCESSFUL SWITCH OVER FROM 400 KV TO 130 KV | RINGHALS-2, Sweden |
31-03-1995 | INES 0 | CRACKS IN PUMP AND VALVE CASINGS | OSKARSHAMN-1, Sweden |
27-04-1995 | INES 0 | REACTOR SCRAM DUE TO A REACTOR PROTECTION SPURIOUS SIGNAL | BOHUNICE-2, Slovakia |
20-06-1995 | INES 0 | REACTOR SCRAM DURING INSPECTION OF GROUND CONNECTION | BOHUNICE-4, Slovakia |
25-06-1993 | INES 0 | LEVEL DECREASE IN THE EMERGENCY BORON TANK | PAKS-1, Hungary |
11-08-1995 | INES 0 | PERSONNEL INJURY IN TURBINE HALL DURING REFUELLING | LEIBSTADT, Switzerland |
25-09-1995 | INES 0 | INADVERTENT CLOSURE OF MSIV GENERATED SI SIGNAL FOLLOWED BY REACTOR TRIP | KRSKO, Slovenia |
13-09-1995 | INES 0 | UNIT SCRAM DUE TO BLOWHOLE IN EMERGENCY REACTOR COOLING SYSTEM(ECCS) PIPE | SMOLENSK-1, Russian Federation |