date INES title location
1993-03-05INES 1UNITS DERATED TO 60% REACTOR POWER DUE TO SAFETY ANALYSIS CONCERNSCanadaBRUCE-1
1990-01-23INES 2REACTOR COOLANT LEAK DURING ON POWER REFUELLING DUE TO FUELLLING MACHINE DROPCanadaBRUCE-4
1995-05-14INES 1SPURIOUS OPENING OF REACTOR COOLANT LIQUID RELIEF VALVECanadaBRUCE-5
2002-06-11INES 0Empty Pressure Tube Damaged During Routine MaintenanceCanadaBRUCE-6
2002-12-24INES 1Start-up Instrumentation ImpairmentCanadaBRUCE-7
1993-02-15INES 0UNIT SHUTDOWN DUE TO HEAVY WATER LEAK AT A FUELLING MACHINECanadaDARLINGTON-2
2001-11-11INES 0Heat Transport Steam Bleed Valve Failed Open Causing Unit TripCanadaDARLINGTON-3
1991-09-19INES 1FUEL BUNDLE DAMAGE DURING TRANSFER TO SPENT FUEL BAYCanadaGENTILLY-2
1995-09-04INES 2PRESSURIZER DRAIN VALVE FAILURE CAUSING HEAT TRANSPORT SYSTEM LEAKS AND FORCED OUTAGECanadaGENTILLY-2
2003-08-14INES 2Total Impairment of the High Pressure Emergency Core Injection System Affecting Five (5) Reactor Units at Pickering NGSCanadaPickering A - B NGS
1996-04-19INES 1ECI impairment due to check valve failure resulting in forced outage of Pickering stationCanadaPICKERING-1
1994-12-10INES 2SMALL LOCA DUE TO REACTOR COOLANT RELIEF VALVE FAILURECanadaPICKERING-2
1991-05-31INES 2INCORRECT CALIBRATION OF SHUTDOWN SYSTEM AND TWO REGIONAL OVERPOWER DETECTORSCanadaPOINT LEPREAU
1996-05-24INES 1Failure to replace horizontal flux detector shielding after maintenanceCanadaPOINT LEPREAU
1996-10-04INES 2Emergency water/reheater drains distribution header damage inside the steam generatorsCanadaPOINT LEPREAU
1997-01-17INES 1Primary heat transport system leakage from coolant channel outlet feederCanadaPOINT LEPREAU
1994-05-25INES 0REACTOR SCRAM BY ATWT SIGNAL DURING PERIODIC TESTChinaGUANGDONG-1
1995-02-14INES 1DROP TIME OF CONTROL RODS OUT OF CRITERIONChinaGUANGDONG-1
1993-03-30INES 0TURBINE TRIP ON SG HIGH-HIGH WATER LEVEL FOLLOWED BY REACTOR TRIPChinaQINSHAN 1
1994-02-02INES 0REACOR SCRAM AND TURBINE TRIP BY RCP BUS LOW VOLTAGEChinaQINSHAN 1
1995-12-15INES 0TURBINE TRIP AND REACTOR SCRAM DUE TO TO AG WATER LEVEL HIGH-HIGHChinaQINSHAN 1
1990-12-04INES 2LOSS OF ELECTRICAL OFF-SITE POWER AFFECTED THE FOUR UNITS LOAD REJECTION AND DIESEL GENERATOR FAILEDCzech RepublicDUKOVANY-1
1991-01-21INES 0REACTOR SCRAM DUE TO A FIRE OF SECOND CATEGORY OF RELIABILITY BUSESCzech RepublicDUKOVANY-1
1992-08-18INES 1LOW ACTIVITY BORATED WATER LEAK FROM MAKE-UP SYSTEMCzech RepublicDUKOVANY-1
1993-01-11INES 0FIRE ON HYDROGEN PRESSURE CYLINDERCzech RepublicDUKOVANY-1