10-05-1992INES 0PARTIAL DRAINING OF H2O DOUSING TANK DURING UNIT START UPRAJASTHAN-2, India
29-09-1992INES 0AUTOMATIC SHUTDOWN OF UNIT-2 OF FUKUSHIMA DAIICHI NPPFUKUSHIMA-DAIICHI-2, Japan
19-06-1992INES 0UNIT NO. 1 SCRAM ON PRM CH. 6 & IRM CH. 9 KICKING UP DURING FUNCTIONAL CHECKSTARAPUR-1, India
31-07-1992INES 0UNIT NO. 2 REACTOR SCRAM ON PRM HIGH FLUXTARAPUR-2, India
21-08-1992INES 0FAILURE OF 5231 CB-5 TO CLOSE DURING FAILURE 5231 DG-1 TO START WHEN STATION CLASS IV SUPPLY FAILEDRAJASTHAN-1, India
15-06-1992INES 0REACTOR UNIT NO. 1 SCRAM ON TOTAL LOSS OF POWERTARAPUR-1, India
16-10-1992INES 0REACTOR SCRAM ON PRM HIGH FLUXTARAPUR-1, India
13-10-1992INES 0REACTOR TRIP DURING ROUTINE CHECKING OF GROUND IN 250 V DC CIRCUITKALPAKKAM-1, India
18-10-1992INES 0UNSCHEDULED SHUTDOWN DUE TO STEAM LEAKAGE FROM AN OUTLET PIPE OF A HIGH PRESSURE TURBINEFUGEN ATR, Japan
17-01-1993INES 0NON-AVAILABILITY OF CHANNEL TEMPERATURE MONITORING (CTM) INSTALLATION-2RAJASTHAN-2, India
16-01-1993INES 0NON TRIPPING OV CHANNEL-E ON HIGH BOILER DIFFERENTIAL TEMPERATURE WHILE DOING TESTINGKALPAKKAM-2, India
02-07-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR LOW LOW LEVEL SIGNALKORI 1, South Korea
09-08-1993INES 0REACTOR SHUTDOWN DUE TO LIGHTNINGYONGGWANG-2, South Korea
10-08-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR HIGH HIGH LEVEL SIGNALYONGGWANG-2, South Korea
16-09-1993INES 0REACTOR TRIP DUE TO STEAM GENERATOR HIGH HIGH LEVEL SIGNALYONGGWANG-2, South Korea
18-10-1993INES 0REACTOR TRIP DUE TO FAST CLOSURE OF MAIN FEED ISOLATION VALVES (MFIV)KORI-3, South Korea
28-10-1993INES 0REACTOR TRIP DUE TO GENERATOR TRIP CAUSED BY ACTIVATION OF GENERATOR PROTECTION RELAYKORI 1, South Korea
03-11-1993INES 0REACTOR TRIP DUE TO FAST CLOSURE OF MAIN STEAM ISOLATION VALVE (MSIV)KORI-3, South Korea
10-11-1993INES 0REACTOR TRIP DUE TO FLUCTUATION OF PRESSURE IN MOISTURE SEPARATOR AND REHEATER (MSR) DRAIN TANKKORI-2, South Korea
23-11-1993INES 0REACTOR TRIP DUE TO TROUBLE OF DISCONNECTOR SWITCH IN SWITCH YARDULCHIN-1, South Korea
06-12-1993INES 0REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNALKORI-3, South Korea
10-12-1993INES 0REACTOR TRIP DUE TO FAST CLOSURE OF MAIN FEEDWATER ISOLATION VALVE (MFIV) CAUSED BY MALFUNCTION OF LOGIC CIRCUITKORI-4, South Korea
15-12-1993INES 0REACTOR TRIP DUE TO GROUNDING OF POWER SUPPLY OF CONTROL RODSYONGGWANG-2, South Korea
21-12-1993INES 0REACTOR TRIP DUE TO MAIN CONDENSER VACUUM LOW SIGNALKORI-2, South Korea
11-01-1994INES 0REACTOR TRIP DUE TO FAST CLOSURE OF MAIN STEAM ISOLATION VALVE (MSIV)KORI-4, South Korea
30-03-1993INES 0TURBINE TRIP ON SG HIGH-HIGH WATER LEVEL FOLLOWED BY REACTOR TRIPQINSHAN 1, China
23-05-1994INES 0REACTOR TRIP DUE TO FAILURE OF MAIN FEEDWATER CONTROL VALVE (MFCV)ULCHIN-2, South Korea
29-06-1994INES 0REACTOR TRIP DUE TO GROUND OF MAIN GENERATOR PROTECTION RELAYKORI 1, South Korea
16-06-1994INES 0FLOODING IN BASEMENT AND SUB BASEMENT OF TURBINE BUILDINGKAKRAPAR-1, India
02-02-1994INES 0REACOR SCRAM AND TURBINE TRIP BY RCP BUS LOW VOLTAGEQINSHAN 1, China