| date | INES | title | location  |
| 01-06-1992 | INES 0 | REPAIR OF REACTOR PRESSURE VESSEL HEAD PENETRATION | RINGHALS-2, Sweden |
| 08-12-1992 | INES 1 | INCORRECT CONNECTION OF CABLES TO RELAYS IN SAFETY SYSTEMS | RINGHALS-2, Sweden |
| 18-04-1994 | INES 1 | INCORRECT SAFEGUARD REPORTING | RINGHALS-2, Sweden |
| 03-10-1994 | INES 2 | STEAM GENERATOR SAFETY VALVES WERE NOT FUNCTIONING ACCORDING TO SPECIFICATIONS | RINGHALS-2, Sweden |
| 09-04-1995 | INES 0 | UNSUCCESSFUL SWITCH OVER FROM 400 KV TO 130 KV | RINGHALS-2, Sweden |
| 28-05-1995 | INES 1 | ROUTINE SURVEILLANCE REVEALS: STEAM GENERATOR SAFETY VALVES OPEN AT HIGHER PRESSURE THAN SPECIFIED AT THE RINGHALS 2. 3 AND 4 PWRS | RINGHALS-2, Sweden |
| 01-07-1997 | INES 1 | Two out of four diesel generators unavailable due to loose connection to the voltage regulator | RINGHALS-2, Sweden |
| 17-08-1997 | INES 1 | Automatic protection system disconnected during non nuclear heat up after refuelling | RINGHALS-2, Sweden |
| 12-02-1995 | INES 1 | NOT FULLY INSERTED CONTROL RODS | RINGHALS-3, Sweden |
| 18-09-1991 | INES 1 | ONE FUEL ASSEMBLY TILTED DURING REFUELLING | RINGHALS-4, Sweden |
| 22-08-1994 | INES 0 | ONE CONTROL ROD NOT FULLY INSERTED AFTER SCRAM | RINGHALS-4, Sweden |
| 15-11-1995 | INES 1 | DEVIATION FROM TECHNICAL SPECIFICATIONS | RINGHALS-4, Sweden |
| 27-09-1997 | INES 2 | Closed valves in the containment spray pumps' suction lines during the non-nuclear phase of start-up after refueling | RINGHALS-4, Sweden |
| 27-07-2009 | INES 3 | Overexposure in the field radiography | ROil refinery, Gdansk, Poland |
| 09-04-2002 | INES 1 | Damage of a type "A" package during transhipment at Roissy airport (France) between Poland and Ukraine | Roissy Charles De Gaulle airport, France |
| 11-04-2001 | INES 1 | Shut down of Rovno NPP unit 2 because of fall of a crane's boom | ROVNO-2, Ukraine |
| 13-12-1992 | INES 1 | REACTOR SHUTDOWN BY THE ACTUATION OF THE EMERGENCY PROTECTION SYSTEM FOLLOWED BY NON-COMPLIANCE WITH THE SAFE OPERATING LIMITS ON STEAM GENERATOR COOLDOWN RATE | ROVNO-2, Ukraine |
| 01-09-2025 | INES 3 | Radiation worker exposure exceeding 10 times the annual limit | Roztoky u Prahy, museum, Czech Republic |
| 30-06-2001 | INES 1 | Unauthorized dismantling of a furnace containing Co-60 radioactive sources | S.C. Forever/ Calan, Romania |
| 30-05-2013 | INES 2 | Interventional Radiology - Exceeding of the maximum regulatory annual effective dose | Saint-Eloi Hospital (Montpellier), France |
| 04-12-2000 | INES 1 | Loss of a radioactive package between Orange (84-France) and Thrion-Gardals (28-France) | SAPHYMO, France |
| 21-07-2022 | INES 2 | Contamination of an employee and the break room in a nuclear medicine department | SCINTIGARD radiology centre (Nîmes), France |
| 08-05-1999 | INES 2 | Melting of a radioactive source with scrap metals | SCRAPYARD, Greece |
| 09-08-2001 | INES 1 | New equipment with CO-60 in steel flanges in non-nuclear research institute | SCRAPYARD, Netherlands |
| 05-02-2017 | INES 2 | Over Exposure of an Operator From a Puncture Wound During Work in an Active Glovebox | Sellafield, United Kingdom |
| 15-08-2016 | INES 2 | Electronic Personal Dosimeter went into Alarm during X-ray Radiography Operations | Sellafield, United Kingdom |
| 08-01-2017 | INES 2 | Personal Contamination at Reprocessing Plant | Sellafield, United Kingdom |
| 09-10-2025 | INES 2 | Exposure of a worker to a level of 50% of the statutory dose limit | Sellafield, United Kingdom |
| 23-01-2009 | INES 2 | Radioactive contamination spread from release of ventilation duct condensate at Sellafield | Sellafield Ltd, Cumbria, United Kingdom |
| 25-05-2022 | INES 2 | Exposure of a worker in excess of the statutory dose limit | Sellafield Ltd. UK, United Kingdom |