date  | INES | title | location |
| 24-05-1996 | INES 1 | Failure to replace horizontal flux detector shielding after maintenance | POINT LEPREAU, Canada |
| 21-05-1996 | [N/A] | Injuries in the NPP Dukovany non-related to nuclear and radiation safety | DUKOVANY-1, Czech Republic |
| 16-05-1996 | INES 1 | Disturbance of forced reactor coolant circulation in cold shutdown condition | KOZLODUY-5, Bulgaria |
| 15-05-1996 | INES 1 | Small leak of radioactive water from auxiliary building no. 2 | KOZLODUY-3, Bulgaria |
| 15-05-1996 | INES 0 | Reactor trip due to steam generator level low signal | YONGGWANG-4, South Korea |
| 13-05-1996 | INES 2 | Degradation of seismic stops of the reactor pit | CHINON-B1, France |
| 03-05-1996 | INES 2 | Radioactive contamination of the fertilizer due to Co-60 source failure | SOFERT RACAU FACTORY, Romania |
| 30-04-1996 | INES 1 | Exceeding allowed maximum primary coolant temperature during planned outage | KHMELNITSKI-1, Ukraine |
| 25-04-1996 | INES 0 | Reacotr trip due to steam generator level high signal | ULCHIN-1, South Korea |
| 24-04-1996 | INES 1 | Radioactive contamination at the Unit N3 | CHERNOBYL-3, Ukraine |
| 21-04-1996 | INES 1 | Spurious signal for actuation of the ESFAS caused by human error | DUKOVANY-3, Czech Republic |
| 19-04-1996 | INES 1 | ECI impairment due to check valve failure resulting in forced outage of Pickering station | PICKERING-1, Canada |
| 16-04-1996 | INES 1 | Violation of limits and conditions - a late test of emergency core cooling system pumps | DUKOVANY-2, Czech Republic |
| 15-04-1996 | INES 1 | Penetration of primary coolant and low level contamination of hermetic box | BOHUNICE-4, Slovakia |
| 06-04-1996 | INES 2 | Sticking of a control rod cluster during reactor scram | BELLEVILLE-1, France |
| 04-04-1996 | INES 0 | Electrical fire in the control room | PALO VERDE-2, United States of America |
| 31-03-1996 | INES 0 | Reactor trip due to improper operation of main feedwater bypass valve | KORI 1, South Korea |
| 30-03-1996 | INES 0 | Reactor trip due to actuation of sensitive relay influenced by starting current | KORI 1, South Korea |
| 29-03-1996 | INES 0 | Power excursion and subsequent plant trip | KANUPP, Pakistan |
| 19-03-1996 | INES 0 | Unit trip on no primary circulating pump running | NARORA-1, India |
| 04-03-1996 | INES 1 | FAILURE OF A CONTAINMENT ISOLATION VALVE AT A PERIODICAL TEST | OSKARSHAMN-1, Sweden |
| 28-02-1996 | INES 1 | Internal Contamination of Several Workers While Cleaning up Equipment | VANDELLOS-1, Spain |
| 13-02-1996 | INES 0 | REACTOR COOLANT SPILLAGE DURING OVERHAUL | YONGGWANG-3, South Korea |
| 09-02-1996 | INES 0 | REACTOR SHUTDOWN BY THE FAST-ACTING SCRAM SYSTEM DUE TO SPURIOUS SIGNALS OF INCREASED PRESSURE IN THE ISOLATION CONTROL VALVES ROOM | IGNALINA-1, Lithuania |
| 06-02-1996 | INES 1 | LOSS OF OFFSITE POWER AND SAFETY INJECTION | CATAWBA-2, United States of America |
| 02-02-1996 | INES 0 | Reactor trip due to degradation of photoresistic cell in the main feedwater control system | ULCHIN-1, South Korea |
| 31-01-1996 | INES 1 | Reactor scram followed by the actuation of safety valve in the reactor primary circuit | NIIAR Inst., Dimitrovgrad, Russian Federation |
| 30-01-1996 | INES 2 | PARTIAL LOSS OF ESSENTIAL SERVICE WATER DUE TO FRAZIL ICE ON INTAKE TRASH RACKS | WOLF CREEK, United States of America |
| 23-01-1996 | INES 0 | Reactor trip due to spurious signal generated by mistake of worker | YONGGWANG-1, South Korea |
| 22-01-1996 | INES 0 | LEAKAGE OF THE FEEDWATER OF RECIRCULATION PIPELINE | BN-350, Kazakhstan |