Laka Foundation

Legenda & explanation
date INES title location
04-09-1990INES 1REACTOR START UP WITH DEGRADED REACTOR SHUT DOWN SYSTEMSLEIBSTADT, Switzerland
22-09-1992INES 1SMALL FIRES CAUSED BY SHORT-CIRCUITKOZLODUY-5, Bulgaria
18-08-1992INES 1LOW ACTIVITY BORATED WATER LEAK FROM MAKE-UP SYSTEMDUKOVANY-1, Czech Republic
16-04-1992INES 1DEGRADED WATER CHEMISTRY IN THE PRIMARY CIRCUIT DUE TO CEMENT MORTAR INGRESS INTO THE BORATED WATER STORAGE TANKKOLA-2, Russian Federation
06-07-1992INES 1FAILURE OF TWO DIESEL GENERATORS WHILE ROUTINE TESTING DURING UNIT MAINTENANCEBALAKOVO-2, Russian Federation
18-01-1992INES 1AN IMPORTANT LOSS OF COMMUNICATIONS IN MAIN CONTROL ROOMLAGUNA VERDE-1, Mexico
13-05-1992INES 1RECIRCULATION TRANSIENT WITH A SUDDEN INCREASE IN POWER OVER 100%LAGUNA VERDE-1, Mexico
28-05-1992INES 1A NON USUAL EVENT DUE TO THE LIBERATION OF GASES INSIDE THE PLANTLAGUNA VERDE-1, Mexico
18-09-1992INES 1LOSS OF INTERNAL POWER DUE TO THE TRIP OF THE MAIN TRANSFORMER (T-1)LAGUNA VERDE-1, Mexico
13-12-1991INES 1CONTAMINATION OF SUBSOIL AT DHRUVA - CIRUS COMPLEXDHRUVA, India
13-05-1992INES 1UNIT-2 EMERGENCY CONDENSER LOOP A TUBE FAILURETARAPUR-2, India
19-08-1992INES 1STARTUP AUXILIARY TRANSFORMER X03B OUTAGE EXCEEDING SEVEN DAYS LIMITTARAPUR-2, India
04-07-1992INES 1INSPECTION HEAD LEFT IN CHANNEL G-09 IN UNIT-2RAJASTHAN-2, India
03-09-1992INES 1LOSS OF 250V DC CONTROL POWER SUPPLY TO 415 V BKRS CONNECTED WITH CLASS-III BUS L&LXRAJASTHAN-2, India
15-10-1992INES 1LEAKAGE OF REACTOR CIRCUIT PIPE 76 MM DIAMETER FROM REACTOR CHANNEL 32-24 TO THE DRUM SEPARATORIGNALINA-2, Lithuania
12-11-1992INES 1UNIT OPERATION WITH ONE REACTOR PROTECTION SYSTEM CHANNEL OUTSOUTH UKRAINE-2, Ukraine
13-12-1992INES 1REACTOR SHUTDOWN BY THE ACTUATION OF THE EMERGENCY PROTECTION SYSTEM FOLLOWED BY NON-COMPLIANCE WITH THE SAFE OPERATING LIMITS ON STEAM GENERATOR COOLDOWN RATEROVNO-2, Ukraine
08-12-1992INES 1INCORRECT CONNECTION OF CABLES TO RELAYS IN SAFETY SYSTEMSRINGHALS-2, Sweden
02-01-1993INES 1SMALL STEAM LEAK FROM THE MAIN FLANGE OF THE PRIMARY COOLANT PUMP NO. 4KOZLODUY-2, Bulgaria
01-11-1992INES 1INDICATIONS IN AUSTENITIC PIPING DISCOVERED DURING NON-DESTRUCTIVE TESTINGBRUNSBUETTEL, Germany
21-08-1992INES 1SOIL CONTAMINATION WHILE PUMPING OUT RAIN WATER FROM TAPS-TRAP TRANSFER LINE INSPECTION PITTARAPUR-1, India
16-09-1992INES 1TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEMKALPAKKAM-2, India
17-09-1992INES 1TRITIUM ACTIVITY DISCHARGE TO LAKERAJASTHAN-2, India
05-03-1993INES 1UNITS DERATED TO 60% REACTOR POWER DUE TO SAFETY ANALYSIS CONCERNSBRUCE-1, Canada
24-02-1993INES 1CRACKS IN PIPEBENDS (ELBOWS) IN THE RESIDUAL HEAT REMOVAL SYSTEMOSKARSHAMN-1, Sweden
05-03-1993INES 1COOLANT RADIOACTIVITY EXCEEDING OPERATING LIMITS DUE TO FUEL ROD FAILUREANGRA-1, Brazil
14-03-1993INES 1PVNGS 2 STEAM GENERATOR TUBE RUPTUREPALO VERDE-2, United States of America
12-02-1993INES 1PLUTONIUM RECOVERY PLANT, B204BNFL, Sellafield, United Kingdom
27-05-1993INES 1UNIT SCRAM DUE TO INADVERTENT ACTUATION OF PRESSURIZER PILOT RELIEF VALVEKOLA-3, Russian Federation
02-02-1993INES 1UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADOKOLA-3, Russian Federation