| date | INES | title  | location |
| 22-07-1991 | INES 3 | BREACH OF UNIT LIMITING CONDITIONS FOR OPERATION WHILE PREPARING FOR RESTART AFTER MAINTENANCE DUE TO ECCS AND MSV UNAVAILABILITY | SMOLENSK-2, Russian Federation |
| 16-09-1991 | INES 2 | BORON MEASURING DEVICE CALIBRATION ERROR AT THE CHEMICAL LABORATORY | CHINON-B1, France |
| 27-08-2001 | INES 2 | Boron concentration below specification in borated water storage tanks of 3 out of 4 ECCS trains | PHILIPPSBURG-2, Germany |
| 30-06-2015 | INES 2 | Bordeaux University: discovery of radioactive sources and incidental exposure of persons | Bordeaux University, France |
| 25-10-1991 | INES 2 | BORATED WATER STORAGE TANK LEVEL REDUCTION TO 180 M3 | NOVOVORONEZH-4, Russian Federation |
| 03-03-1993 | INES 0 | BLOWN FUSE ON THE INVERTER CAUSED REACTOR TRIP | KRSKO, Slovenia |
| 09-09-2000 | INES 0 | Beloyarsk NPP Unit 3 scram due to events in the operation of the Urals power system | BELOYARSKY-3(BN-600), Russian Federation |
| 22-07-2021 | INES 2 | Automatic trip of both reactors following loss of off-site electric supplies | Heysham 1 Power Station, United Kingdom |
| 22-07-2021 | INES 2 | Automatic trip of both reactors following loss of off-site electric supplies | Heysham 1 Power Station, United Kingdom |
| 11-06-1998 | INES 2 | Automatic shutdown of the reactor caused by spurious triggering of the containment spray system and jamming of a control cluster in the high position during this shutdown | BELLEVILLE-2, France |
| 14-07-1994 | INES 0 | AUTOMATIC SHUT DOWN OF THE REACTOR AFTER GENERATOR PROTECTION ACTIVATION | KRSKO, Slovenia |
| 12-11-1995 | INES 0 | AUTOMATIC REACTOR UNLOADING DUE TO TURBOGENERATOR TRIP BY OPERATOR | IGNALINA-1, Lithuania |
| 22-11-1995 | INES 1 | AUTOMATIC REACTOR UNLOADING DUE TO SPURIOUS OPENINGS OF VALVES BETWEEN A GROUP OF ECCS PRESSURIZED TANKS AND REACTOR | IGNALINA-2, Lithuania |
| 08-07-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY SPURIOUS CLOSING OF THE GATE VALVE AT THE PIPELINE FEEDING THE MAIN CONDENSATE HEATER WITH HEATING STEAM | IGNALINA-2, Lithuania |
| 09-08-1994 | INES 0 | AUTOMATIC REACTOR SHUTDOWN CAUSED BY GENERATOR TRIP | IGNALINA-1, Lithuania |
| 17-08-1997 | INES 1 | Automatic protection system disconnected during non nuclear heat up after refuelling | RINGHALS-2, Sweden |
| 05-01-1990 | INES 0 | AUTOMATIC PLANT SHUTDOWN DUE TO AN EARTHQUAKE | KRSKO, Slovenia |
| 11-07-2003 | INES 2 | Auto-trip of R21, following trip of Main Boiler Feed Pump, subsequent breach of Gas Circulator 22 Inlet Temp. limit | DUNGENESS-B1 UNIT A, United Kingdom |
| 26-09-2012 | INES 2 | ASN decided to uprate as level 2 on the INES scale an event related to non-compliance with the requirements applicable to labelling, storage and on-site transfer of wet fissile materials | AREVA-FBFC, France |
| 31-12-2003 | INES 2 | Anomaly on the water recirculation circuits of French pressurised water reactors | All NPP - generic, France |
| 09-12-2005 | INES 2 | Anomaly on safety pumps of 900 MW reactors | All NPP - generic, France |
| 23-02-2012 | INES 1 | Am-241 source melting | Outokumpu Tornio Works, Finland |
| 21-09-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
| 15-09-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
| 26-06-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
| 26-07-2018 | INES 1 | Am-241 source melting | Finnish steel factory, Finland |
| 28-11-2020 | INES 1 | Am-241 meltings | Finnish steel factory, Finland |
| 22-12-2005 | INES 0 | Activation of emergency plan support to Torness Power Station | TORNESS UNIT A, United Kingdom |
| 18-10-1993 | INES 0 | ACID SPILLAGE IN THORP | BNFL, Sellafield, United Kingdom |
| 24-03-2023 | INES 1 | Accidental exposure of workers | Radioisotope Centre POLATOM, Otwock-Świerk, Poland |