1996-04-06INES 2Sticking of a control rod cluster during reactor scramFranceBELLEVILLE-1
2017-06-20INES 2Emergency diesel generators auxiliary systems not compliant with seismic requirements on the 1300 MW reactors (8 sites - 20 reactors)FranceBELLEVILLE-1
2017-08-02INES 2Risk of loss of heat sink in case of an earthquake - 20 reactors concernedFranceBELLEVILLE-1
1991-06-22INES 2DEFECTIVE WELDS IN LOW PRESSURE SAFETY INJECTION SYSTEMFranceBELLEVILLE-2
1991-05-24INES 2UNAVAILABILITY OF REACTOR LEVEL MEASUREMENTFranceBELLEVILLE-2
1991-07-10INES 2INADVERTENT DILUTION OF THE PRIMARY FLUID DURING A COLD SHUTDOWNFranceBELLEVILLE-2
1998-06-11INES 2Automatic shutdown of the reactor caused by spurious triggering of the containment spray system and jamming of a control cluster in the high position during this shutdownFranceBELLEVILLE-2
1999-12-28INES 2Partial loss of safeguards systems as a result of external floodingFranceBLAYAIS-1
2013-04-24INES 2Accidental exposure of a worker exceeding annual regulatory limit to the skinFranceBLAYAIS-4
2015-08-18INES 2Irradiation of a worker during scheduled NNP outage at Le BlayaisFranceBLAYAIS-4
1991-09-23INES 2DEFECTS IN BUGEY AND FESSENHEIM POWER PLANT REACTOR VESSEL HEADSFranceBUGEY-2
1994-01-29INES 2FAILING TO COMPLY WITH THE OPERATING PROCEDURESFranceBUGEY-5
1992-08-21INES 2ABNORMAL PRESENCE OF A FILTER ON A DRAINING CIRCUIT OF THE REACTOR CAVITYFranceCATTENOM-1
2004-05-16INES 1Fire on electric cables in Cattenom-2 NPPFranceCATTENOM-2
2011-12-21INES 2Level 2 incident on INES scale concerning a pipe nonconformity in two Cattenom NPP fuel storage poolsFranceCATTENOM-2 and 3
2023-02-02INES 2External contamination of a worker leading to exceeding of the annual statutory dose limitFranceCATTENOM-3
1991-06-12INES 2PARTIAL INOPERABILITY OF THE REACTOR PROTECTION SYSTEMFranceCATTENOM-4
1991-09-16INES 2BORON MEASURING DEVICE CALIBRATION ERROR AT THE CHEMICAL LABORATORYFranceCHINON-B1
1996-05-13INES 2Degradation of seismic stops of the reactor pitFranceCHINON-B1
2010-04-23INES 2Worker overexposure FranceCHINON-B4
1998-05-13INES 2Large leak in the residual heat removal system (RHR)FranceCIVAUX-1
2019-05-06INES 2Emergency diesel generators - earthquake resistance riskFranceCIVAUX-1
1990-07-01INES 2IMPACT ON SAFETY DUE TO VIOLATION OF OPERATIONAL LIMITS AND CONDITIONS (IMPURITY DUE TO AIR INGRESS)FranceCREYS-MALVILLE
2021-08-24INES 2External contamination of a worker leading to exceeding of the regulatory annual limit for the equivalent dose to the skinFranceCRUAS-2
2009-12-01INES 2Shutdown of Cruas unit 4 after heat sink incidentFranceCRUAS-4