| date | INES  | title | location |
| 24-02-1994 | INES 1 | DETERIORATION OF THE PRIMARY CIRCUIT INTEGRITY | IGNALINA-2, Lithuania |
| 09-12-1993 | INES 1 | EXCEEDING OF CL-CONCENTRATION IN PRIMARY CIRCUIT WATER | BOHUNICE-2, Slovakia |
| 22-04-1993 | INES 1 | INTERVENTION OF AUTOMATIC POWER CONTROL (APC) DUE TO SPURIOUS SIGNAL | BOHUNICE-2, Slovakia |
| 23-02-1993 | INES 1 | FALL DOWN OF CONNECTOR FRAGMENTS INTO THE REACTOR VESSEL | BOHUNICE-2, Slovakia |
| 18-10-1993 | INES 1 | VIOLATION OF CHEMICAL REGIME OF STEAM GENERATOR FEED WATER (SGFW) | BOHUNICE-3, Slovakia |
| 03-06-1993 | INES 1 | DIESEL GENERATOR START FAILURE | BOHUNICE-3, Slovakia |
| 18-04-1994 | INES 1 | SCRAM DUE TO THE LEVEL DROP IN TANKS OF EMERGENCY REACTOR COOLING SYSTEM | CHERNOBYL-3, Ukraine |
| 18-04-1994 | INES 1 | INCORRECT SAFEGUARD REPORTING | RINGHALS-2, Sweden |
| 18-03-1994 | INES 1 | OVEREXPOSURE OF OPERATORS WHILE CHARGING IRRADIATED FUEL BUNDLES INTO THE DISSOLVER | TROMBAY PLUTONIUM PLANT, India |
| 12-04-1994 | INES 1 | IRRADIATED FUEL ROD REMAINING IN THE FLASK WITHOUT COOLING - HUMAN ERROR | CIRUS, India |
| 07-04-1994 | INES 1 | PLANT TRANSIENT INITIALLY CAUSED BY THE LOSS OF CIRCULATING WATER PUMPS DUE TO HIGH MARSH GRASS/DEBRIS CONCENTRATIONS | SALEM-1, United States of America |
| 15-05-1994 | INES 1 | DETERIORATION OF NATURAL CIRCULATION DURING REPAIR WORKS AT UNIT NO. 1 | KOZLODUY-1, Bulgaria |
| 25-05-1994 | INES 1 | DEFECT OF MAIN GATE VALVE STUDS | SOUTH UKRAINE-1, Ukraine |
| 18-05-1994 | INES 1 | RUPTURE OF PRESTRESSED CABLE WIRES CONTAINMENTS DOME PART | SOUTH UKRAINE-1, Ukraine |
| 11-07-1994 | INES 1 | MALFUNCTION IN THE SYSTEM OF NEUTRON CONTROL OF REACTOR POWER FOLLOWING THE REPLACEMENT OF A CONTROL ROD SWITCH | IGNALINA-2, Lithuania |
| 11-08-1994 | INES 1 | OVERFLOW OF A SOLUTION IN THE MAPU WORKSHOP (MEDIUM ACTIVITY PLUTONIM WORKSHOP) AT THE UP2-400 PLANT | LA HAGUE, France |
| 31-08-1994 | INES 1 | LEAKING ISOLATION VALVES IN THE EMERGENCY CORE COOLING SYSTEM | BARSEBECK-2, Sweden |
| 31-08-1994 | INES 1 | DAMAGE TO A SPENT FUEL ASSEMBLY DURING PREPARATORY OPERATIONS FOR REPROCESSING | MAYAK, RT-1, Russian Federation |
| 17-10-1994 | INES 1 | THROUGH WALL CRACK OF THE UPPER PART OF THE FUEL CHANEL TRACT NO. 41-13 | CHERNOBYL-3, Ukraine |
| 24-11-1994 | INES 1 | LOSS OF ELECTRICAL SUPPLY OF THE BANK PUMP STATION OF KOZLODUY NPP | KOZLODUY-1, Bulgaria |
| 26-08-1994 | INES 1 | MISSING LUBRICATION GREASE TO THE ECC SYSTEM'S CORE SPRAY PUMPS | BARSEBECK-1, Sweden |
| 28-09-1994 | INES 1 | PROTECTION SYSTEM FOR INITIATING BLOW DOWN NOT COMPLETELY REESTABLISHED AFTER REFUELLING OUTAGE | BARSEBECK-1, Sweden |
| 15-06-1994 | INES 1 | UNINTENTIONAL SLOW INSERTION OF ALL CONTROL RODS | FORSMARK-3, Sweden |
| 11-12-1994 | INES 1 | REACTOR AUTOMATIC SHUTDOWN BY SIGNAL OF NUCLEAR INSTRUMENTATION SYSTEMSYSTEM | ONAGAWA-1, Japan |
| 29-01-1995 | INES 1 | HUMAN ERROR INITATED REACTOR TRIP | CHERNOBYL-3, Ukraine |
| 12-02-1995 | INES 1 | NOT FULLY INSERTED CONTROL RODS | RINGHALS-3, Sweden |
| 12-08-1994 | INES 1 | INADVERTENT LOADING OF FUEL COLUMN DURING ON-POWER REFUELLING OF COOLANT CHANNEL | KALPAKKAM-1, India |
| 07-10-1994 | INES 1 | NON RETRACTION OF SOUTH FUELLING MACHINE GUIDE SLEEVE FROM CHANNELS S-12 | RAJASTHAN-2, India |
| 14-02-1995 | INES 1 | DROP TIME OF CONTROL RODS OUT OF CRITERION | GUANGDONG-1, China |
| 14-05-1995 | INES 1 | SPURIOUS OPENING OF REACTOR COOLANT LIQUID RELIEF VALVE | BRUCE-5, Canada |