date INES title location
19-11-2024INES 3Worker Exposure Caused by a Radiation-Generating DeviceHwaseong-si, South Korea
10-05-2019INES 2Auxiliary feedwater system actuation and manual reactor trip due to careless withdrawal of control rods at Hanbit Unit 1HANBIT-1, South Korea
25-05-1994INES 0REACTOR SCRAM BY ATWT SIGNAL DURING PERIODIC TESTGUANGDONG-1, China
14-02-1995INES 1DROP TIME OF CONTROL RODS OUT OF CRITERIONGUANGDONG-1, China
24-07-1996INES 2Over-exposure of one worker during the industrial radiography activitiesGILAN, Iran
24-08-2018INES 2Accidential Exposure of Industrial Radiography WorkerGeoje, South Korea
11-03-2011INES 3Loss of the cooling function to the ultimate heat sink due to the big tsunamiFUKUSHIMA-DAINI-4, Japan
11-03-2011INES 3Loss of the cooling function to the ultimate heat sink due to the big tsunamiFUKUSHIMA-DAINI-2, Japan
11-03-2011INES 3Loss of the cooling function to the ultimate heat sink due to the big tsunamiFUKUSHIMA-DAINI-1, Japan
11-03-2011INES 3Effect to the Nuclear Facilities from the earthquake on east area of JapanFUKUSHIMA-DAIICI-1,2 FUKUSHIMA-DAINI-1, Japan, Japan
11-03-2011INES 3Loss of cooling function and water supplying function on the spent fuel pool due to the big tsunami.FUKUSHIMA-DAIICHI-4, Japan
09-09-1990INES 0REACTOR AUTOMATIC SHUTDOWN DUE TO INCORRECT FUNCTIONING OF A MAIN STEAM ISOLATION VALVEFUKUSHIMA-DAIICHI-3, Japan
11-03-2011INES 5The core damage by loss of all cooling function due to the big tsunami.FUKUSHIMA-DAIICHI-3, Japan
29-09-1992INES 0AUTOMATIC SHUTDOWN OF UNIT-2 OF FUKUSHIMA DAIICHI NPPFUKUSHIMA-DAIICHI-2, Japan
11-03-2011INES 5The core damage by loss of all cooling function due to the big tsunami.FUKUSHIMA-DAIICHI-2, Japan
12-03-2011INES 5Abnormal rise of radioactive dosage value at site boundary (INES Level 4)FUKUSHIMA-DAIICHI-1, Japan
22-02-2015[N/A]Possible Flow of Contaminated Water to the Outside of the Controlled AreaFUKUSHIMA-DAIICHI, Japan
17-12-2014[N/A]Leakage of Water Treated by the Multi-Nuclide Removal Facility (ALPS)FUKUSHIMA-DAIICHI, Japan
17-09-2014[N/A]Discovery of a Crack in a Connection Valve between Tanks for Concentrated Water Treated by Reverse OsmosisFUKUSHIMA-DAIICHI, Japan
02-06-2014[N/A]Leakage of Contaminated Water from Two Notch TanksFUKUSHIMA-DAIICHI, Japan
13-04-2014[N/A]Inappropriate Transfer of Contaminated WaterFUKUSHIMA-DAIICHI, Japan
20-02-2014[N/A]Leakega of Contaminated Water from the Upper Part of Tank C-1 in H-6 Tank AreaFUKUSHIMA-DAIICHI, Japan
06-02-2014[N/A]Leakage of Contaminated Water from a Flange of Water Pressure Measuring instrumentFUKUSHIMA-DAIICHI, Japan
09-10-2013[N/A]Leakage of Contaminated Water from a Desalination SystemFUKUSHIMA-DAIICHI, Japan
02-10-2013[N/A]Leakege of Contaminated Water from the Top Plate of a Tank at B Area (South)FUKUSHIMA-DAIICHI, Japan
20-02-2014[N/A]Leakage of Contaminated Water from the Upper Part of Tank C-1 in H-6 Tank AreaFUKUSHIMA-DAIICHI, Japan
02-10-2013[N/A]Leakage of Contaminated Water from the Top Plate of a Tank at B Area (South)FUKUSHIMA-DAIICHI, Japan
15-09-2015[N/A]Leakages of water from the dikes in tank areas storing contaminated waterFUKUSHIMA-DAIICHI, Japan
29-05-2015[N/A]Contaminated water being transferred to turbine building of unit 3 from 1000 tons notch tank was leaking from the cracked pressure hoseFUKUSHIMA-DAIICHI, Japan
20-04-2016[N/A]Leakage from Piping Transferring RO-Concentrated Water to G-6 Tank AreaFUKUSHIMA-DAIICHI, Japan