Europe: Ukraine

Legenda & explanation
date INES title location
28-11-2014INES 0Event during operation of Zaporizhzhya NPP Unit №3ZAPOROZHYE-3
17-07-1999INES 2Workers exposure exceeding a statutory annual dose limitCHERNOBYL-3
10-11-1998INES 2Workers exposure during weld testsZAPOROZHE-3
22-08-1997INES 2Fresh fuel assembly damage during refuellingSOUTH UKRAINE-2
24-07-1996INES 1On-site radioactive contaminationKHMELNITSKI-1
28-06-1996INES 0Radioactive contamination in the reactor hallCHERNOBYL-1
30-04-1996INES 1Exceeding allowed maximum primary coolant temperature during planned outageKHMELNITSKI-1
24-04-1996INES 1Radioactive contamination at the Unit N3CHERNOBYL-3
27-11-1995INES 3RADIOACTIVE CONTAMINATION IN THE REACTOR BUILDINGCHERNOBYL-1
03-12-1995INES 0UNIT COLD SHUT DOWN BECAUSE OF THE FLAW IN PIPELINE OF THE PRIMARY MAIN COOLANT PUMPZAPOROZHE-1
27-10-1995INES 0UNIT SHUTDOWN BECAUSE OF THE REFUELING MACHINE'S EQUIPMENT FAILURECHERNOBYL-1
28-09-1995[N/A]ELECTRICAL FIRE OF THE AIR COMPRESSOR MOTORCHERNOBYL-1
29-01-1995INES 1HUMAN ERROR INITATED REACTOR TRIPCHERNOBYL-3
17-10-1994INES 1THROUGH WALL CRACK OF THE UPPER PART OF THE FUEL CHANEL TRACT NO. 41-13CHERNOBYL-3
18-05-1994INES 1RUPTURE OF PRESTRESSED CABLE WIRES CONTAINMENTS DOME PARTSOUTH UKRAINE-1
25-05-1994INES 1DEFECT OF MAIN GATE VALVE STUDSSOUTH UKRAINE-1
06-04-1994INES 2DEFECT OF THE REACTOR PROTECTION SYSTEM LEVEL CONTROLLER OF THE STEAM GENERATORSOUTH UKRAINE-1
18-04-1994INES 1SCRAM DUE TO THE LEVEL DROP IN TANKS OF EMERGENCY REACTOR COOLING SYSTEMCHERNOBYL-3
16-03-1994INES 1REACTOR SCRAM CAUSED BY THE CABLE FIRE UNDER THE TURBINE HALL PREMISESKHMELNITSKI-1
08-03-1994INES 0SHUNT TRANSFORMER INFLAMMATION AT THE HIGH-VOLTAGE (750 KW) LINE SWITCHYARDZAPOROZHE-1
12-01-1994INES 2RADIOACTIVE CONTAMINATION IN AUXILIARY BUILDINGZAPOROZHE-4
20-10-1993[N/A]DISAPPEARANCE OF TWO FUEL ELEMENTS FROM THE FRESH FUEL STORAGE PREMISESCHERNOBYL-3
28-06-1993INES 0RADIOACTIVE SPOT AT THE NPP SITEZAPOROZHE-1
16-06-1993INES 2RADIOACTIVE CONTAMINATION OF THE PART OF NPP SITEZAPOROZHE-1
28-05-1993[N/A]EXTRAORDINARY SHUTDOWN OF THE UNIT BECAUSE OF HYDROGEN LEAKAGE IN THE COOLING SYSTEM OF THE GENERATORSOUTH UKRAINE-3
21-05-1993[N/A]HYDROGEN IGNITION ON THE COOLING SYSTEM OF THE TURBOGENERATORZAPOROZHE-5
18-03-1993INES 0REACTOR SHUTDOWN BY THE ACTUATION EMERGENCY PROTECTION CAUSED BY THE LEVEL RAISE IN DRUM SEPARATORCHERNOBYL-3
14-01-1993INES 0WOODEN SLEEPERS STORED AT THE SEPARATING WALL BETWEEN UNITS 3 & 4 CAUGHT FIRECHERNOBYL-3
12-01-1993INES 0CABLE CATCHING FIRE AT THE CONNECTION POINT FOR PORTABLE UTILIZING EQUIPMENTCHERNOBYL-3
13-12-1992INES 1REACTOR SHUTDOWN BY THE ACTUATION OF THE EMERGENCY PROTECTION SYSTEM FOLLOWED BY NON-COMPLIANCE WITH THE SAFE OPERATING LIMITS ON STEAM GENERATOR COOLDOWN RATEROVNO-2