| date | INES  | title | location |
| 30-11-1995 | INES 1 | OVEREXPOSURE OF OPERATOR DURING CALIBRATION OF IN-CORE SENSORS | IGNALINA-2, Lithuania |
| 01-01-1995 | INES 1 | DESIGN DEFICIENCIES IDENTIFIED IN SEPARATION OF ELECTRICAL SYSTEM, AVOIDANCE OF COMMON CAUSE FAILURES IN THE REACTOR PROTECTION SYSTEM AND OVERPRESSURE RELEASE IN THE AUX BUILD. | OSKARSHAMN-1, Sweden |
| 26-08-1995 | INES 1 | DESIGN DEFICIENCIES IN DIESEL GENERATORS FOUND DURING EXTENDED TESTING | OSKARSHAMN-1, Sweden |
| 15-11-1995 | INES 1 | DEVIATION FROM TECHNICAL SPECIFICATIONS | RINGHALS-4, Sweden |
| 31-01-1996 | INES 1 | Reactor scram followed by the actuation of safety valve in the reactor primary circuit | NIIAR Inst., Dimitrovgrad, Russian Federation |
| 21-01-1996 | INES 1 | A PART OF THE RESIDUAL HEAT REMOVAL SYSTEM - THE AUXILIARY CONDENSER - TEMPORARILY NOT AVAILABLE | OSKARSHAMN-1, Sweden |
| 04-03-1996 | INES 1 | FAILURE OF A CONTAINMENT ISOLATION VALVE AT A PERIODICAL TEST | OSKARSHAMN-1, Sweden |
| 15-04-1996 | INES 1 | Penetration of primary coolant and low level contamination of hermetic box | BOHUNICE-4, Slovakia |
| 24-04-1996 | INES 1 | Radioactive contamination at the Unit N3 | CHERNOBYL-3, Ukraine |
| 30-04-1996 | INES 1 | Exceeding allowed maximum primary coolant temperature during planned outage | KHMELNITSKI-1, Ukraine |
| 15-05-1996 | INES 1 | Small leak of radioactive water from auxiliary building no. 2 | KOZLODUY-3, Bulgaria |
| 12-06-1996 | INES 1 | Degraded pressure subpression (PS) function | BARSEBECK-2, Sweden |
| 16-05-1996 | INES 1 | Disturbance of forced reactor coolant circulation in cold shutdown condition | KOZLODUY-5, Bulgaria |
| 12-07-1996 | INES 1 | Degradation of essential service water (ES'W) for a year due to a defficient design modification | ASCO-1, Spain |
| 24-07-1996 | INES 1 | On-site radioactive contamination | KHMELNITSKI-1, Ukraine |
| 13-08-1996 | INES 1 | Water leak into a hot cell at the Studsvik research establishment | Studsvik Nuclear AB, Sweden |
| 18-07-1996 | INES 1 | Erroneous line-up before start-up of vent pipe valves to the scrubber system | FORSMARK-1, Sweden |
| 28-02-1996 | INES 1 | Internal Contamination of Several Workers While Cleaning up Equipment | VANDELLOS-1, Spain |
| 17-01-1997 | INES 1 | Slow insertion of control rods | ALMARAZ-2, Spain |
| 16-04-1996 | INES 1 | Violation of limits and conditions - a late test of emergency core cooling system pumps | DUKOVANY-2, Czech Republic |
| 21-04-1996 | INES 1 | Spurious signal for actuation of the ESFAS caused by human error | DUKOVANY-3, Czech Republic |
| 08-07-1996 | INES 1 | Violation of limts and conditions - a late test of spray pumps | DUKOVANY-4, Czech Republic |
| 06-10-1996 | INES 1 | Scram of the reactor caused by a wrong operation of the control room operator | DUKOVANY-4, Czech Republic |
| 05-02-1997 | INES 1 | Supposedly empty shipping containers found to contain nuclear material | ENUSA, Spain |
| 01-07-1997 | INES 1 | Two out of four diesel generators unavailable due to loose connection to the voltage regulator | RINGHALS-2, Sweden |
| 16-05-1997 | INES 1 | Degraded containment pressure suppression function during shutdown of reactor before outage period | FORSMARK-2, Sweden |
| 17-08-1997 | INES 1 | Automatic protection system disconnected during non nuclear heat up after refuelling | RINGHALS-2, Sweden |
| 26-07-1997 | INES 1 | Slightly increased radioactivity release outside the reactor while preparing for removal of leaky fuel assembly | MIR-M1, RU-0013, Russian Federation |
| 26-03-1997 | INES 1 | Worker contamination for AM-241 inhalation when manipulating a radiation detector | VANDELLOS-1, Spain |
| 28-01-1999 | INES 1 | Loss of reactor annulus integrity | TRILLO-1, Spain |