07-02-1995INES 0STEAM GENERATOR TUBE LEAK AT MAPS-2KALPAKKAM-2, India
14-05-1995INES 1SPURIOUS OPENING OF REACTOR COOLANT LIQUID RELIEF VALVEBRUCE-5, Canada
14-02-1995INES 1DROP TIME OF CONTROL RODS OUT OF CRITERIONGUANGDONG-1, China
27-04-1995INES 0REACTOR SCRAM DUE TO A REACTOR PROTECTION SPURIOUS SIGNALBOHUNICE-2, Slovakia
08-03-1995INES 0REACTOR TRIP DUE TO ACTUATION OF GROUND FAULT RELAYYONGGWANG-2, South Korea
25-02-1995INES 0SAFETY INJECTION DUE TO PRESSURIZER SPRAY VALVE STACKKORI-2, South Korea
25-03-1995[N/A]GASEOUS RELEASE FROM NEARBY CHEMICAL PLANTWATERFORD-3, United States of America
31-03-1995INES 0CRACKS IN PUMP AND VALVE CASINGSOSKARSHAMN-1, Sweden
09-04-1995INES 0UNSUCCESSFUL SWITCH OVER FROM 400 KV TO 130 KVRINGHALS-2, Sweden
30-03-1995INES 0UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWERKRSKO, Slovenia
07-10-1994INES 1NON RETRACTION OF SOUTH FUELLING MACHINE GUIDE SLEEVE FROM CHANNELS S-12RAJASTHAN-2, India
25-08-1994INES 0PROBLEM IN LOWERING FRESH FUEL BUNDLE IN THE REACTORDHRUVA, India
12-08-1994INES 1INADVERTENT LOADING OF FUEL COLUMN DURING ON-POWER REFUELLING OF COOLANT CHANNELKALPAKKAM-1, India
23-02-1995INES 0SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT BBIBLIS-B, Germany
13-02-1995[N/A]CARBON DIOXIDE RELEASE TO A PLANT VITAL AREAH.B. ROBINSON-2, United States of America
12-02-1995INES 1NOT FULLY INSERTED CONTROL RODSRINGHALS-3, Sweden
29-01-1995INES 1HUMAN ERROR INITATED REACTOR TRIPCHERNOBYL-3, Ukraine
11-12-1994INES 1REACTOR AUTOMATIC SHUTDOWN BY SIGNAL OF NUCLEAR INSTRUMENTATION SYSTEMSYSTEMONAGAWA-1, Japan
03-12-1994INES 0TURBINE AND REACTOR TRIP DUE TOMFCV TROUBLEYONGGWANG-1, South Korea
20-10-1994INES 2HEAVY WATER SPILLAGE IN CONTAINMENTWOLSONG-3, South Korea
04-12-1994INES 0LEAKAGE IN MANUAL VALVE INTO TECHNICAL SPECIFICATIONSALMARAZ-1, Spain
10-12-1994INES 2SMALL LOCA DUE TO REACTOR COOLANT RELIEF VALVE FAILUREPICKERING-2, Canada
03-10-1994INES 2STEAM GENERATOR SAFETY VALVES WERE NOT FUNCTIONING ACCORDING TO SPECIFICATIONSRINGHALS-2, Sweden
15-06-1994INES 1UNINTENTIONAL SLOW INSERTION OF ALL CONTROL RODSFORSMARK-3, Sweden
28-09-1994INES 1PROTECTION SYSTEM FOR INITIATING BLOW DOWN NOT COMPLETELY REESTABLISHED AFTER REFUELLING OUTAGEBARSEBECK-1, Sweden
26-08-1994INES 1MISSING LUBRICATION GREASE TO THE ECC SYSTEM'S CORE SPRAY PUMPSBARSEBECK-1, Sweden
24-11-1994INES 1LOSS OF ELECTRICAL SUPPLY OF THE BANK PUMP STATION OF KOZLODUY NPPKOZLODUY-1, Bulgaria
06-03-1994INES 0DEPRESSURIZATION OF CONTROL ROD HOUSING DISCOVERED DURING ROUTINE INSPECTIONKOLA-3, Russian Federation
03-11-1994INES 0INFRINGEMENT OF THE REACTOR PRIMARY CIRCUIT INTEGRITYIGNALINA-1, Lithuania
25-09-1994INES 0REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNALKORI-2, South Korea