| 12-11-1995 | INES 0 | AUTOMATIC REACTOR UNLOADING DUE TO TURBOGENERATOR TRIP BY OPERATOR | IGNALINA-1, Lithuania |
| 27-10-1995 | INES 0 | UNIT SHUTDOWN BECAUSE OF THE REFUELING MACHINE'S EQUIPMENT FAILURE | CHERNOBYL-1, Ukraine |
| 13-09-1995 | INES 0 | UNIT SCRAM DUE TO BLOWHOLE IN EMERGENCY REACTOR COOLING SYSTEM(ECCS) PIPE | SMOLENSK-1, Russian Federation |
| 28-09-1995 | [N/A] | ELECTRICAL FIRE OF THE AIR COMPRESSOR MOTOR | CHERNOBYL-1, Ukraine |
| 25-09-1995 | INES 0 | INADVERTENT CLOSURE OF MSIV GENERATED SI SIGNAL FOLLOWED BY REACTOR TRIP | KRSKO, Slovenia |
| 04-09-1995 | INES 2 | PRESSURIZER DRAIN VALVE FAILURE CAUSING HEAT TRANSPORT SYSTEM LEAKS AND FORCED OUTAGE | GENTILLY-2, Canada |
| 15-07-1995 | INES 1 | ONE CLOSED VALVE IN THE CONTAINMENT PRESSURE RELIEF LINE TO THE ATMOSPHERE AND TWO CLOSED VALVES IN THE VENTING LINE TO THE EMERGENCY FILTER | FORSMARK-2, Sweden |
| 24-11-1994 | INES 1 | LOSS OF OFF-SITE AC POWER | KOZLODUY-1, Bulgaria |
| 01-05-1995 | INES 2 | ELEVATED URANIUM LUNG BURDEN | BNFL SPRINGFIELDS, United Kingdom |
| 11-08-1995 | INES 0 | PERSONNEL INJURY IN TURBINE HALL DURING REFUELLING | LEIBSTADT, Switzerland |
| 20-07-1995 | INES 0 | AMMONIA RELEASE FROM NEARBY CHEMICAL PLANT | WATERFORD-3, United States of America |
| 07-06-1995 | INES 1 | PERSONNEL IRRADIATION IN A THERMAL POWER PLANT DURING MAINTENANCE WORKS | TPP BORZESTI, Romania |
| 02-05-1995 | INES 1 | SHORT VIOLATION OF LIMITS AND CONDITIONS DUE TO ONE AND A HALF HOUR UNAVAILABILITY OF 2 OUT OF 3 SAFETY SYSTEMS | DUKOVANY-1, Czech Republic |
| 09-07-1995 | [N/A] | SMALL SCALE FIRE IN THE SWITCHGEAR FOR THE SECONDARY CIRCUIT DURING SHUTDOWN | DUKOVANY-1, Czech Republic |
| 27-04-1995 | INES 0 | REACTOR TRIP DUE TO FEEDWATER CONTROL VALVE CLOSURE | YONGGWANG-3, South Korea |
| 03-04-1995 | INES 0 | REACTOR TRIP DUE TO MAIN FEEDWATER PUMPS STOP | KORI-3, South Korea |
| 20-06-1995 | INES 0 | LEAK FROM LIFTING CHARGING PUMP RELIEF VALVE | H.B. ROBINSON-2, United States of America |
| 10-07-1995 | INES 1 | UNINTENTIONAL RELEASE TO THE SEA OF A MINOR AMOUNT OF SLIGHTLYCONTAMINATED WATER | BARSEBECK-1, Sweden |
| 04-07-1995 | INES 2 | SKIN EXPOSURE IN EXCESS OF DOSE LIMIT | BNFL, Sellafield, United Kingdom |
| 08-05-1995 | INES 1 | INADVERTENT DISCHARGE OF LIQUID RADIOACTIVE WASTE | TARAPUR WASTE IMM. PLANT, India |
| 15-09-1993 | INES 1 | DETERIORATION OF NATURAL CIRCULATION | PAKS-2, Hungary |
| 03-05-1993 | INES 1 | UNCONTROLLED INCREASE OF REACTOR POWER | PAKS-4, Hungary |
| 25-06-1993 | INES 0 | LEVEL DECREASE IN THE EMERGENCY BORON TANK | PAKS-1, Hungary |
| 23-12-1992 | INES 1 | LEVEL DECREASE IN ECCS TANK 20TJ20B001,2 | PAKS-2, Hungary |
| 14-07-1994 | INES 1 | SIMULTANEOUS INOPERABILITY OF TWO HIGH-PRESSURE ECCS PUMPS | PAKS-4, Hungary |
| 03-01-1994 | INES 1 | RENDERING AN EMERGENCY FEEDWATER PUMP AND AN AUXILIARY EMERGENCY FEEDWATER PUMP AVAILABLE FOR A SHORT TIME WITHOUT ADHERANCE TO THE REQUIREMENTS OF THE TECSPECS | PAKS-4, Hungary |
| 20-06-1995 | INES 0 | REACTOR SCRAM DURING INSPECTION OF GROUND CONNECTION | BOHUNICE-4, Slovakia |
| 09-06-1995 | INES 2 | FAILURE OF THE ACCESS CONTROL SYSTEM ON THE LARGE HEAVY ION ACCELERATOR GANIL | GANIL, France |
| 02-06-1995 | INES 1 | TURBINE/REACTOR TRIP CAUSED BY AN ERROR IN THE EH CONTROL SYSTEM OF THE TURBINE GENERATOR | KRSKO, Slovenia |
| 28-05-1995 | INES 1 | ROUTINE SURVEILLANCE REVEALS: STEAM GENERATOR SAFETY VALVES OPEN AT HIGHER PRESSURE THAN SPECIFIED AT THE RINGHALS 2. 3 AND 4 PWRS | RINGHALS-2, Sweden |