date | INES | title | location |
28-06-1992 | INES 1 | TRITIUM ACTIVITY IN PROCESS WATER RETURN | RAJASTHAN-2, India |
04-07-1992 | INES 1 | INSPECTION HEAD LEFT IN CHANNEL G-09 IN UNIT-2 | RAJASTHAN-2, India |
06-07-1992 | INES 1 | FAILURE OF TWO DIESEL GENERATORS WHILE ROUTINE TESTING DURING UNIT MAINTENANCE | BALAKOVO-2, Russian Federation |
24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 2 HIGH LEVEL | KRSKO, Slovenia |
24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 1 HIGH LEVEL | KRSKO, Slovenia |
28-07-1992 | INES 2 | CLOGGED PUMP SUCTION STRAINERS IN THE WET WELL POOL | BARSEBECK-2, Sweden |
30-07-1992 | INES 2 | FUEL ELEMENT DROP | TRIGA MARK II, Bangladesh |
31-07-1992 | INES 0 | UNIT NO. 2 REACTOR SCRAM ON PRM HIGH FLUX | TARAPUR-2, India |
12-08-1992 | INES 0 | UNIT SCRAM DUE TO SHORT-TIME DEENERGIZATION OF AUXILIARY POWER BUSES | KOLA-1, Russian Federation |
17-08-1992 | INES 0 | CRACKS IN FEED WATER NOZZLES | RINGHALS-1, Sweden |
18-08-1992 | INES 1 | LOW ACTIVITY BORATED WATER LEAK FROM MAKE-UP SYSTEM | DUKOVANY-1, Czech Republic |
19-08-1992 | INES 1 | STARTUP AUXILIARY TRANSFORMER X03B OUTAGE EXCEEDING SEVEN DAYS LIMIT | TARAPUR-2, India |
21-08-1992 | INES 2 | ABNORMAL PRESENCE OF A FILTER ON A DRAINING CIRCUIT OF THE REACTOR CAVITY | CATTENOM-1, France |
21-08-1992 | INES 0 | FAILURE OF 5231 CB-5 TO CLOSE DURING FAILURE 5231 DG-1 TO START WHEN STATION CLASS IV SUPPLY FAILED | RAJASTHAN-1, India |
21-08-1992 | INES 1 | SOIL CONTAMINATION WHILE PUMPING OUT RAIN WATER FROM TAPS-TRAP TRANSFER LINE INSPECTION PIT | TARAPUR-1, India |
01-09-1992 | INES 2 | INCONCLUSIVE QUALIFICATION TEST RESULTS OF ELECTRIC CONNECTORS IN LOCA AND SLB ENVIRONMENT | DOEL-3, Belgium |
03-09-1992 | INES 1 | LOSS OF 250V DC CONTROL POWER SUPPLY TO 415 V BKRS CONNECTED WITH CLASS-III BUS L&LX | RAJASTHAN-2, India |
08-09-1992 | INES 3 | PLUTONIUM NITRATE LEAK IN CELL | BNFL, Sellafield, United Kingdom |
12-09-1992 | INES 0 | LOW ACTIVITY WATER LEAK FROM THE CONTAMINATED CONDENSATE TANK | KOLA-3, Russian Federation |
16-09-1992 | INES 1 | TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEM | KALPAKKAM-2, India |
17-09-1992 | INES 1 | TRITIUM ACTIVITY DISCHARGE TO LAKE | RAJASTHAN-2, India |
18-09-1992 | INES 1 | LOSS OF INTERNAL POWER DUE TO THE TRIP OF THE MAIN TRANSFORMER (T-1) | LAGUNA VERDE-1, Mexico |
21-09-1992 | INES 2 | REACTOR SHUTDOWN CAUSED BY AN EMERGENCY PROTECTION SYSTEM ACTUATION FOLLOWED BY NON-COMPLIANCE WITH THE SAFETY LIMITS | SOUTH UKRAINE-1, Ukraine |
22-09-1992 | INES 1 | SMALL FIRES CAUSED BY SHORT-CIRCUIT | KOZLODUY-5, Bulgaria |
29-09-1992 | INES 0 | AUTOMATIC SHUTDOWN OF UNIT-2 OF FUKUSHIMA DAIICHI NPP | FUKUSHIMA-DAIICHI-2, Japan |
11-10-1992 | INES 2 | METALLURGICAL DEFECTS ON THE MAIN STEAM LINES OF A REACTOR | ST. ALBAN-1, France |
13-10-1992 | INES 0 | REACTOR TRIP DURING ROUTINE CHECKING OF GROUND IN 250 V DC CIRCUIT | KALPAKKAM-1, India |
15-10-1992 | INES 0 | LEAKAGE FROM REACTOR CIRCUIT PIPE, DIAMETER 26 | IGNALINA-2, Lithuania |
15-10-1992 | INES 1 | LEAKAGE OF REACTOR CIRCUIT PIPE 76 MM DIAMETER FROM REACTOR CHANNEL 32-24 TO THE DRUM SEPARATOR | IGNALINA-2, Lithuania |
16-10-1992 | INES 0 | REACTOR SCRAM ON PRM HIGH FLUX | TARAPUR-1, India |