| 02-03-1993 | INES 0 | MINOR LEAKAGE IN A 15 MM PIPE TO A PILOT VALVE IN THE PRESSURE RELIEF SYSTEM | RINGHALS-1, Sweden |
| 28-02-1993 | INES 0 | MINOR LEAKAGE IN A 32 MM VALVE BONNET SEAL | RINGHALS-1, Sweden |
| 25-02-1993 | INES 2 | FEEDWATER PIPE RUPTURE | LOVIISA-2, Finland |
| 23-01-1993 | INES 0 | INSUFFICIENT CONTROL ROD FUNCTION DURING HOT START UP TEST | RINGHALS-1, Sweden |
| 09-02-1993 | INES 0 | FIRE IN A NON-SAFETY RELATED CABINET IN THE CONTROLLED AREA | TIHANGE-1, Belgium |
| 01-11-1992 | INES 1 | INDICATIONS IN AUSTENITIC PIPING DISCOVERED DURING NON-DESTRUCTIVE TESTING | BRUNSBUETTEL, Germany |
| 02-02-1993 | INES 3 | UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO | KOLA-1, Russian Federation |
| 30-12-1992 | INES 2 | PROLONGED LOSS OF VENTILATION IN THE FUEL FABRICATION BUILDING IN THE FBFC ESTABLISHMENT | FBFC, France |
| 14-01-1993 | INES 0 | WOODEN SLEEPERS STORED AT THE SEPARATING WALL BETWEEN UNITS 3 & 4 CAUGHT FIRE | CHERNOBYL-3, Ukraine |
| 12-01-1993 | INES 0 | CABLE CATCHING FIRE AT THE CONNECTION POINT FOR PORTABLE UTILIZING EQUIPMENT | CHERNOBYL-3, Ukraine |
| 11-01-1993 | INES 0 | FIRE ON HYDROGEN PRESSURE CYLINDER | DUKOVANY-1, Czech Republic |
| 12-01-1993 | INES 2 | SIGNIFICANT SPILLAGE OF PLUTONIUM LADEN SOLVENT | BNFL, Sellafield, United Kingdom |
| 02-01-1993 | INES 1 | SMALL STEAM LEAK FROM THE MAIN FLANGE OF THE PRIMARY COOLANT PUMP NO. 4 | KOZLODUY-2, Bulgaria |
| 08-12-1992 | INES 1 | INCORRECT CONNECTION OF CABLES TO RELAYS IN SAFETY SYSTEMS | RINGHALS-2, Sweden |
| 13-12-1992 | INES 1 | REACTOR SHUTDOWN BY THE ACTUATION OF THE EMERGENCY PROTECTION SYSTEM FOLLOWED BY NON-COMPLIANCE WITH THE SAFE OPERATING LIMITS ON STEAM GENERATOR COOLDOWN RATE | ROVNO-2, Ukraine |
| 12-11-1992 | INES 1 | UNIT OPERATION WITH ONE REACTOR PROTECTION SYSTEM CHANNEL OUT | SOUTH UKRAINE-2, Ukraine |
| 23-11-1992 | INES 2 | CONTAMINATION OF WORKERS DUE TO THE RUPTURE OF A MIXED OXIDE FUEL ROD DURING FABRICATION | FBFC, Belgium |
| 04-11-1992 | INES 0 | DENT ON THE PIPE OF REACTOR CHANNEL 10-33 TO THE DRUM SEPARATOR | IGNALINA-1, Lithuania |
| 15-10-1992 | INES 1 | LEAKAGE OF REACTOR CIRCUIT PIPE 76 MM DIAMETER FROM REACTOR CHANNEL 32-24 TO THE DRUM SEPARATOR | IGNALINA-2, Lithuania |
| 17-11-1992 | INES 2 | UNIT SCRAM OWING TO LOSS OF DC PANEL POWER | KOLA-1, Russian Federation |
| 10-11-1992 | INES 0 | SHORT CIRCUIT CAUSED TURBINE/REACTOR TRIP | KRSKO, Slovenia |
| 24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 1 HIGH LEVEL | KRSKO, Slovenia |
| 24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 2 HIGH LEVEL | KRSKO, Slovenia |
| 15-10-1992 | INES 0 | LEAKAGE FROM REACTOR CIRCUIT PIPE, DIAMETER 26 | IGNALINA-2, Lithuania |
| 11-10-1992 | INES 2 | METALLURGICAL DEFECTS ON THE MAIN STEAM LINES OF A REACTOR | ST. ALBAN-1, France |
| 06-07-1992 | INES 1 | FAILURE OF TWO DIESEL GENERATORS WHILE ROUTINE TESTING DURING UNIT MAINTENANCE | BALAKOVO-2, Russian Federation |
| 16-04-1992 | INES 1 | DEGRADED WATER CHEMISTRY IN THE PRIMARY CIRCUIT DUE TO CEMENT MORTAR INGRESS INTO THE BORATED WATER STORAGE TANK | KOLA-2, Russian Federation |
| 01-09-1992 | INES 2 | INCONCLUSIVE QUALIFICATION TEST RESULTS OF ELECTRIC CONNECTORS IN LOCA AND SLB ENVIRONMENT | DOEL-3, Belgium |
| 18-08-1992 | INES 1 | LOW ACTIVITY BORATED WATER LEAK FROM MAKE-UP SYSTEM | DUKOVANY-1, Czech Republic |
| 21-09-1992 | INES 2 | REACTOR SHUTDOWN CAUSED BY AN EMERGENCY PROTECTION SYSTEM ACTUATION FOLLOWED BY NON-COMPLIANCE WITH THE SAFETY LIMITS | SOUTH UKRAINE-1, Ukraine |