date INES title location
21-08-1992INES 2ABNORMAL PRESENCE OF A FILTER ON A DRAINING CIRCUIT OF THE REACTOR CAVITYCATTENOM-1, France
12-08-1992INES 0UNIT SCRAM DUE TO SHORT-TIME DEENERGIZATION OF AUXILIARY POWER BUSESKOLA-1, Russian Federation
28-07-1992INES 2CLOGGED PUMP SUCTION STRAINERS IN THE WET WELL POOLBARSEBECK-2, Sweden
01-06-1992INES 0REPAIR OF REACTOR PRESSURE VESSEL HEAD PENETRATIONRINGHALS-2, Sweden
31-01-1992INES 2DETECTION OF A DESIGN ERROR INTHE LEVEL INSTRUMENTATION IN THE ANNULUS OUTSIDE THE CONTAINMENT SPHERE (BETWEEN THE SPHERE AND THE CONTAINMENT BUILDING)TRILLO-1, Spain
06-12-1991INES 1DEVIATION FROM THE NORMAL ON-LOAD REFUELING REGIME DUE TO FUEL ASSEMBLY SEPARATION FROM THE CONNECTING BARSMOLENSK-3, Russian Federation
10-06-1992INES 1CONTAMINATED PARTICLES DISCOVERED ON-SITEKOZLODUY-1, Bulgaria
19-04-1992INES 0POWER UNIT UNLOADING DUE TO THE THIRD MAIN CIRCULATION PUMP (MCP-3) TURNING-OFF AS A RESULT OF FALSE OPERATION OF MAJOR PROTECTION SYSTEMZAPOROZHE-4, Ukraine
18-03-1992[N/A]NO IMPACT TO SAFETY FOLLOWING RUPTURE OF A BYPASS FEEDWATER LINEKHMELNITSKI-1, Ukraine
24-03-1992INES 2UNIT SHUTDOWN DUE TO DEPRESSURIZATION OF ONE FUEL CHANNELLENINGRAD-3, Russian Federation
04-03-1992INES 0UNIT SHUTDOWN DUE TO FIRE IN THE 6 KV SWITCHGEAR ROOMBALAKOVO-3, Russian Federation
05-02-1992[N/A]STEAM LEAK AT HIGH PRESSURE TURBINE CAPKRSKO, Slovenia
22-01-1992INES 2UNAVAILABILITY OF THE IODINE FILTERING OF REACTOR CONTROL ROOM VENTILATION SYSTEMDAMPIERRE-1, France
29-01-1992INES 0NO IMPACT ON SAFETY FOLLOWING A FIRE IN THE AUXILIARY BUILING OF UNITS 3 AND 4KOZLODUY-3, Bulgaria
30-12-1991INES 2UNIT SHUTDOWN AS A RESULT OF SPURIOUS OPERATION OF THE FIRE EXTINGUISHING SYSTEM AND DUE TO FLOODING OF ESFAS PANELSZAPOROZHE-2, Ukraine
05-01-1992INES 0NO IMPACT TO SAFETY AFTER IGNITION OF THERMAL INSULATION OF A PIPE IN THE PRIMARY COOLANT SYSTEMKOZLODUY-5, Bulgaria
10-09-1991INES 1REVEAL OF INADVERTENTLY CLOSED MANUAL SERVICE VALVES AT VERIFICATION TESTS OF THE SCRAM SYSTEM BEFORE PREPARATIONS TO RESTARTFORSMARK-2, Sweden
07-12-1991INES 0DAMAGE TO RCP MAIN THRUST BEARING WHILE PREPARING PRIMARY FOR HYDROTESTKOLA-3, Russian Federation
18-09-1991INES 1ONE FUEL ASSEMBLY TILTED DURING REFUELLINGRINGHALS-4, Sweden
22-07-1991INES 3BREACH OF UNIT LIMITING CONDITIONS FOR OPERATION WHILE PREPARING FOR RESTART AFTER MAINTENANCE DUE TO ECCS AND MSV UNAVAILABILITYSMOLENSK-2, Russian Federation
25-10-1991INES 2BORATED WATER STORAGE TANK LEVEL REDUCTION TO 180 M3NOVOVORONEZH-4, Russian Federation
23-09-1991INES 2DEFECTS IN BUGEY AND FESSENHEIM POWER PLANT REACTOR VESSEL HEADSBUGEY-2, France
05-11-1991INES 2SIGNIFICANT CONTAMINATION IN THE CHEMICAL PURIFICATION LABORATORY IN THE CADARACHE RESEARCH CENTERCADARACHE, France
02-10-1991INES 2CONTAMINATION OF THE SECONDARY WATER DUE TO ERRORS OF THE SPECIAL WATER TREATMENT FACILITY PERSONNELZAPOROZHE-2, Ukraine
01-07-1991INES 2NEW FUEL ASSEMBLY DROPPING WHILE REFUELINGCHERNOBYL-2, Ukraine
23-01-1991INES 2UNIT SHUTDOWN DUE TO BREACH OF NORMAL OPERATION CONDITIONSZAPOROZHE-1, Ukraine
01-12-1990INES 2ESSENTIAL BUS DEENERGIZATIONSOUTH UKRAINE-1, Ukraine
04-10-1990INES 2TG 2 TRIP DUE TO DEENERGIZATION OF 6 & 0.4 KV BUSES AND FAILURE OF TG STANDBY OIL PUMP TO STARTIGNALINA-1, Lithuania
01-11-1991INES 0PARTIAL DAMAGE TO POWER AND INSTRUMENTATION CABLES OF TURBINE BUILDING VALVES AND AUXILIARY COMPONENTS AS A RESULT OF IGNITIONCHERNOBYL-1, Ukraine
11-10-1991INES 2UNIT SHUTDOWN DUE TO FIRE IN THE TURBINE BUILDING CAUSED BY ELECTRICAL EQUIPMENT FAILURECHERNOBYL-2, Ukraine