date | INES | title  | location |
01-06-1992 | INES 0 | REPAIR OF REACTOR PRESSURE VESSEL HEAD PENETRATION | RINGHALS-2, Sweden |
03-01-1994 | INES 1 | RENDERING AN EMERGENCY FEEDWATER PUMP AND AN AUXILIARY EMERGENCY FEEDWATER PUMP AVAILABLE FOR A SHORT TIME WITHOUT ADHERANCE TO THE REQUIREMENTS OF THE TECSPECS | PAKS-4, Hungary |
05-08-1996 | INES 1 | Release of iodine-131 from 131 production plant of nuclear chemistry division Pakistan Institute of Nuclear Science and Technology | PINSTEC, Pakistan |
09-07-1994 | INES 0 | RELEASE OF IODINE 131 FROM THE TURBINE SYSTEM AT RINGHALS 1 | RINGHALS-1, Sweden |
02-02-1997 | INES 2 | Release of airborne activity into the workplace resulted in a building evacuation | BNFL, Sellafield, United Kingdom |
12-05-1991 | INES 3 | RELEASE OF ACTIVE LIQUID FROM STORAGE TANK | BOHUNICE-1, Slovakia |
31-07-1993 | INES 2 | REFUELLING GRAB FAILURE AT WYLFA | WYLFA UNIT A, United Kingdom |
13-05-1992 | INES 1 | RECIRCULATION TRANSIENT WITH A SUDDEN INCREASE IN POWER OVER 100% | LAGUNA VERDE-1, Mexico |
16-11-2014 | INES 2 | Realizing of maintenance activities without respecting the procedures | Sterigenics, Belgium |
31-03-1992 | INES 0 | REACTOR UNIT NO.2 SCRAM ON TOTAL LOSS OF POWER | TARAPUR-2, India |
19-04-1992 | INES 0 | REACTOR UNIT NO.2 SCRAM ON CONSENSER LOW VACUUM | TARAPUR-2, India |
15-06-1992 | INES 0 | REACTOR UNIT NO. 1 SCRAM ON TOTAL LOSS OF POWER | TARAPUR-1, India |
31-08-1999 | INES 2 | Reactor trip wth complications | INDIAN POINT-2, United States of America |
03-03-1998 | INES 0 | Reactor trip resulting from fast acting scram system (FASS) actuation | IGNALINA-1, Lithuania |
10-03-2004 | INES 2 | Reactor Trip on steam generator differential temperature high due to loss of power supply to Reactor regulating system | KAKRAPAR-1, India |
02-03-1997 | INES 0 | Reactor trip on PHT pressure less than 79.6 kg/cm2 for 15 seconds | KAKRAPAR-1, India |
23-09-1990 | INES 0 | REACTOR TRIP ON PHT LOW PRESSURE | KALPAKKAM-1, India |
27-12-1995 | INES 0 | Reactor trip on low PHT pressure due to change in power while reverse fueling of channel | NARORA-2, India |
12-12-1991 | INES 0 | REACTOR TRIP ON LOW PHT PRESSURE | KALPAKKAM-2, India |
19-12-1991 | INES 0 | REACTOR TRIP ON LOW PHT PRESSURE | KALPAKKAM-1, India |
05-01-1996 | INES 0 | Reactor trip on adjuster rod cooling flow very low | NARORA-2, India |
13-10-1992 | INES 0 | REACTOR TRIP DURING ROUTINE CHECKING OF GROUND IN 250 V DC CIRCUIT | KALPAKKAM-1, India |
06-12-1993 | INES 0 | REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNAL | KORI-3, South Korea |
25-09-1994 | INES 0 | REACTOR TRIP DUE TO TURBINE TRIP CAUSED BY STEAM GENERATOR LEVEL "HI-HI" SIGNAL | KORI-2, South Korea |
23-11-1993 | INES 0 | REACTOR TRIP DUE TO TROUBLE OF DISCONNECTOR SWITCH IN SWITCH YARD | ULCHIN-1, South Korea |
19-06-1996 | INES 0 | Reactor trip due to the malfunction of optical isolator | YONGGWANG-4, South Korea |
10-07-1996 | INES 0 | Reactor trip due to the malfunction of optical isolator | YONGGWANG-4, South Korea |
06-09-1995 | INES 0 | REACTOR TRIP DUE TO THE FAILURE OF CONTROL ROD SYSTEM | YONGGWANG-3, South Korea |
02-07-1993 | INES 0 | REACTOR TRIP DUE TO STEAM GENERATOR LOW LOW LEVEL SIGNAL | KORI 1, South Korea |
18-06-1996 | INES 0 | Reactor trip due to steam generator level low-low signal | KORI-2, South Korea |