| date | INES  | title | location |
| 28-05-1995 | INES 1 | ROUTINE SURVEILLANCE REVEALS: STEAM GENERATOR SAFETY VALVES OPEN AT HIGHER PRESSURE THAN SPECIFIED AT THE RINGHALS 2. 3 AND 4 PWRS | RINGHALS-2, Sweden |
| 02-06-1995 | INES 1 | TURBINE/REACTOR TRIP CAUSED BY AN ERROR IN THE EH CONTROL SYSTEM OF THE TURBINE GENERATOR | KRSKO, Slovenia |
| 03-01-1994 | INES 1 | RENDERING AN EMERGENCY FEEDWATER PUMP AND AN AUXILIARY EMERGENCY FEEDWATER PUMP AVAILABLE FOR A SHORT TIME WITHOUT ADHERANCE TO THE REQUIREMENTS OF THE TECSPECS | PAKS-4, Hungary |
| 14-07-1994 | INES 1 | SIMULTANEOUS INOPERABILITY OF TWO HIGH-PRESSURE ECCS PUMPS | PAKS-4, Hungary |
| 23-12-1992 | INES 1 | LEVEL DECREASE IN ECCS TANK 20TJ20B001,2 | PAKS-2, Hungary |
| 03-05-1993 | INES 1 | UNCONTROLLED INCREASE OF REACTOR POWER | PAKS-4, Hungary |
| 15-09-1993 | INES 1 | DETERIORATION OF NATURAL CIRCULATION | PAKS-2, Hungary |
| 08-05-1995 | INES 1 | INADVERTENT DISCHARGE OF LIQUID RADIOACTIVE WASTE | TARAPUR WASTE IMM. PLANT, India |
| 10-07-1995 | INES 1 | UNINTENTIONAL RELEASE TO THE SEA OF A MINOR AMOUNT OF SLIGHTLYCONTAMINATED WATER | BARSEBECK-1, Sweden |
| 02-05-1995 | INES 1 | SHORT VIOLATION OF LIMITS AND CONDITIONS DUE TO ONE AND A HALF HOUR UNAVAILABILITY OF 2 OUT OF 3 SAFETY SYSTEMS | DUKOVANY-1, Czech Republic |
| 07-06-1995 | INES 1 | PERSONNEL IRRADIATION IN A THERMAL POWER PLANT DURING MAINTENANCE WORKS | TPP BORZESTI, Romania |
| 24-11-1994 | INES 1 | LOSS OF OFF-SITE AC POWER | KOZLODUY-1, Bulgaria |
| 15-07-1995 | INES 1 | ONE CLOSED VALVE IN THE CONTAINMENT PRESSURE RELIEF LINE TO THE ATMOSPHERE AND TWO CLOSED VALVES IN THE VENTING LINE TO THE EMERGENCY FILTER | FORSMARK-2, Sweden |
| 22-11-1995 | INES 1 | AUTOMATIC REACTOR UNLOADING DUE TO SPURIOUS OPENINGS OF VALVES BETWEEN A GROUP OF ECCS PRESSURIZED TANKS AND REACTOR | IGNALINA-2, Lithuania |
| 30-11-1995 | INES 1 | OVEREXPOSURE OF OPERATOR DURING CALIBRATION OF IN-CORE SENSORS | IGNALINA-2, Lithuania |
| 31-10-1995 | INES 1 | HIGH RADIATION LEVELS IN REACTOR BUILDING | LASALLE-1, United States of America |
| 01-01-1995 | INES 1 | DESIGN DEFICIENCIES IDENTIFIED IN SEPARATION OF ELECTRICAL SYSTEM, AVOIDANCE OF COMMON CAUSE FAILURES IN THE REACTOR PROTECTION SYSTEM AND OVERPRESSURE RELEASE IN THE AUX BUILD. | OSKARSHAMN-1, Sweden |
| 26-08-1995 | INES 1 | DESIGN DEFICIENCIES IN DIESEL GENERATORS FOUND DURING EXTENDED TESTING | OSKARSHAMN-1, Sweden |
| 15-11-1995 | INES 1 | DEVIATION FROM TECHNICAL SPECIFICATIONS | RINGHALS-4, Sweden |
| 31-01-1996 | INES 1 | Reactor scram followed by the actuation of safety valve in the reactor primary circuit | NIIAR Inst., Dimitrovgrad, Russian Federation |
| 21-01-1996 | INES 1 | A PART OF THE RESIDUAL HEAT REMOVAL SYSTEM - THE AUXILIARY CONDENSER - TEMPORARILY NOT AVAILABLE | OSKARSHAMN-1, Sweden |
| 04-03-1996 | INES 1 | FAILURE OF A CONTAINMENT ISOLATION VALVE AT A PERIODICAL TEST | OSKARSHAMN-1, Sweden |
| 06-02-1996 | INES 1 | LOSS OF OFFSITE POWER AND SAFETY INJECTION | CATAWBA-2, United States of America |
| 15-04-1996 | INES 1 | Penetration of primary coolant and low level contamination of hermetic box | BOHUNICE-4, Slovakia |
| 24-04-1996 | INES 1 | Radioactive contamination at the Unit N3 | CHERNOBYL-3, Ukraine |
| 30-04-1996 | INES 1 | Exceeding allowed maximum primary coolant temperature during planned outage | KHMELNITSKI-1, Ukraine |
| 15-05-1996 | INES 1 | Small leak of radioactive water from auxiliary building no. 2 | KOZLODUY-3, Bulgaria |
| 19-04-1996 | INES 1 | ECI impairment due to check valve failure resulting in forced outage of Pickering station | PICKERING-1, Canada |
| 12-06-1996 | INES 1 | Degraded pressure subpression (PS) function | BARSEBECK-2, Sweden |
| 16-05-1996 | INES 1 | Disturbance of forced reactor coolant circulation in cold shutdown condition | KOZLODUY-5, Bulgaria |