date  | INES | title | location |
| 02-02-1993 | INES 2 | CAPSULE BREAKAGE IN CENTRAL THIMBLE | TRIGA MARK II, Bangladesh |
| 17-01-1993 | INES 0 | NON-AVAILABILITY OF CHANNEL TEMPERATURE MONITORING (CTM) INSTALLATION-2 | RAJASTHAN-2, India |
| 16-01-1993 | INES 0 | NON TRIPPING OV CHANNEL-E ON HIGH BOILER DIFFERENTIAL TEMPERATURE WHILE DOING TESTING | KALPAKKAM-2, India |
| 01-12-1992 | INES 3 | COBALT-60 SOURCE LOSS | RADIATION FACILITY, China |
| 17-11-1992 | INES 2 | OVEREXPOSURE OF WORKER DUE TO THE MALFUNCTION OF THE INTERLOCK SYSTEM | MICROTRON, Viet Nam |
| 18-10-1992 | INES 0 | UNSCHEDULED SHUTDOWN DUE TO STEAM LEAKAGE FROM AN OUTLET PIPE OF A HIGH PRESSURE TURBINE | FUGEN ATR, Japan |
| 16-10-1992 | INES 0 | REACTOR SCRAM ON PRM HIGH FLUX | TARAPUR-1, India |
| 13-10-1992 | INES 0 | REACTOR TRIP DURING ROUTINE CHECKING OF GROUND IN 250 V DC CIRCUIT | KALPAKKAM-1, India |
| 29-09-1992 | INES 0 | AUTOMATIC SHUTDOWN OF UNIT-2 OF FUKUSHIMA DAIICHI NPP | FUKUSHIMA-DAIICHI-2, Japan |
| 17-09-1992 | INES 1 | TRITIUM ACTIVITY DISCHARGE TO LAKE | RAJASTHAN-2, India |
| 16-09-1992 | INES 1 | TRITIUM RELEASE DUE TO SPILLAGE OF HEAVY WATER FROM MODERATOR SYSTEM | KALPAKKAM-2, India |
| 03-09-1992 | INES 1 | LOSS OF 250V DC CONTROL POWER SUPPLY TO 415 V BKRS CONNECTED WITH CLASS-III BUS L&LX | RAJASTHAN-2, India |
| 21-08-1992 | INES 0 | FAILURE OF 5231 CB-5 TO CLOSE DURING FAILURE 5231 DG-1 TO START WHEN STATION CLASS IV SUPPLY FAILED | RAJASTHAN-1, India |
| 21-08-1992 | INES 1 | SOIL CONTAMINATION WHILE PUMPING OUT RAIN WATER FROM TAPS-TRAP TRANSFER LINE INSPECTION PIT | TARAPUR-1, India |
| 19-08-1992 | INES 1 | STARTUP AUXILIARY TRANSFORMER X03B OUTAGE EXCEEDING SEVEN DAYS LIMIT | TARAPUR-2, India |
| 31-07-1992 | INES 0 | UNIT NO. 2 REACTOR SCRAM ON PRM HIGH FLUX | TARAPUR-2, India |
| 30-07-1992 | INES 2 | FUEL ELEMENT DROP | TRIGA MARK II, Bangladesh |
| 04-07-1992 | INES 1 | INSPECTION HEAD LEFT IN CHANNEL G-09 IN UNIT-2 | RAJASTHAN-2, India |
| 28-06-1992 | INES 1 | TRITIUM ACTIVITY IN PROCESS WATER RETURN | RAJASTHAN-2, India |
| 19-06-1992 | INES 0 | UNIT NO. 1 SCRAM ON PRM CH. 6 & IRM CH. 9 KICKING UP DURING FUNCTIONAL CHECKS | TARAPUR-1, India |
| 15-06-1992 | INES 0 | REACTOR UNIT NO. 1 SCRAM ON TOTAL LOSS OF POWER | TARAPUR-1, India |
| 15-05-1992 | INES 1 | DEUTERIUM EXCURSION IN MODERATOR COVER GAS | RAJASTHAN-2, India |
| 13-05-1992 | INES 1 | UNIT-2 EMERGENCY CONDENSER LOOP A TUBE FAILURE | TARAPUR-2, India |
| 10-05-1992 | INES 0 | PARTIAL DRAINING OF H2O DOUSING TANK DURING UNIT START UP | RAJASTHAN-2, India |
| 05-05-1992 | INES 0 | MODERATOR DUMP TIME RECORDING HIGHER THAN NORMAL | KALPAKKAM-1, India |
| 19-04-1992 | INES 0 | REACTOR UNIT NO.2 SCRAM ON CONSENSER LOW VACUUM | TARAPUR-2, India |
| 31-03-1992 | INES 0 | REACTOR UNIT NO.2 SCRAM ON TOTAL LOSS OF POWER | TARAPUR-2, India |
| 30-03-1992 | INES 1 | DROPPING OF A SPENT FUEL BUNDLE IN INSPECTION BAY | KALPAKKAM-2, India |
| 03-03-1992 | INES 0 | LOSS OF POWER SUPPLY TO CLASS IV SYSTEMS AND UNIT OUTAGE | KALPAKKAM-1, India |
| 12-02-1992 | INES 0 | UNIT-2 REACTOR SCRAM DUE TO GRID DISTURBANCES | TARAPUR-2, India |