| date | INES  | title | location |
| 29-01-2003 | INES 0 | Vehicle Stolen containing a density gauge | UK Transport Event, United Kingdom |
| 05-01-1990 | INES 0 | AUTOMATIC PLANT SHUTDOWN DUE TO AN EARTHQUAKE | KRSKO, Slovenia |
| 30-07-1990 | INES 0 | LEAKAGE IN THE UNDERGROUND TUBE OF THE INTERMEDIATE COOLING CIRCUIT | KRUEMMEL, Germany |
| 21-01-1991 | INES 0 | REACTOR SCRAM DUE TO A FIRE OF SECOND CATEGORY OF RELIABILITY BUSES | DUKOVANY-1, Czech Republic |
| 21-02-1991 | INES 0 | UNIT SHUTDOWN DUE TO COOLANT LEAK IN RCP AUXILIARY PIPELINE | KURSK-4, Russian Federation |
| 13-02-1991 | INES 0 | REACTOR SHUTDOWN DUE TO EXCESS HYDROGEN CONCENTRATION IN THE GENERATOR STATOR GAS TRAP | ZAPOROZHE-4, Ukraine |
| 27-03-1991 | INES 0 | UNIT SHUTDOWN DUE TO PRIMARY CIRCUIT LEAK IN THE LINE OF CONTROLLED LEAKS FROM THE MAIN ISOLATION VALVE SEAL | SOUTH UKRAINE-1, Ukraine |
| 28-03-1991 | INES 0 | UNIT SHUTDOWN DUE TO SHORT CIRCUIT IN THE AUXILIARY POWER TRANSFORMER AND LEAKING OIL FIRE | LENINGRAD-3, Russian Federation |
| 14-08-1991 | INES 0 | INTERNAL LEAKAGE OF PRESSURIZER SAFETY VALVES | STADE, Germany |
| 01-11-1991 | INES 0 | PARTIAL DAMAGE TO POWER AND INSTRUMENTATION CABLES OF TURBINE BUILDING VALVES AND AUXILIARY COMPONENTS AS A RESULT OF IGNITION | CHERNOBYL-1, Ukraine |
| 07-12-1991 | INES 0 | DAMAGE TO RCP MAIN THRUST BEARING WHILE PREPARING PRIMARY FOR HYDROTEST | KOLA-3, Russian Federation |
| 05-01-1992 | INES 0 | NO IMPACT TO SAFETY AFTER IGNITION OF THERMAL INSULATION OF A PIPE IN THE PRIMARY COOLANT SYSTEM | KOZLODUY-5, Bulgaria |
| 29-01-1992 | INES 0 | NO IMPACT ON SAFETY FOLLOWING A FIRE IN THE AUXILIARY BUILING OF UNITS 3 AND 4 | KOZLODUY-3, Bulgaria |
| 04-03-1992 | INES 0 | UNIT SHUTDOWN DUE TO FIRE IN THE 6 KV SWITCHGEAR ROOM | BALAKOVO-3, Russian Federation |
| 19-04-1992 | INES 0 | POWER UNIT UNLOADING DUE TO THE THIRD MAIN CIRCULATION PUMP (MCP-3) TURNING-OFF AS A RESULT OF FALSE OPERATION OF MAJOR PROTECTION SYSTEM | ZAPOROZHE-4, Ukraine |
| 01-06-1992 | INES 0 | REPAIR OF REACTOR PRESSURE VESSEL HEAD PENETRATION | RINGHALS-2, Sweden |
| 12-08-1992 | INES 0 | UNIT SCRAM DUE TO SHORT-TIME DEENERGIZATION OF AUXILIARY POWER BUSES | KOLA-1, Russian Federation |
| 17-08-1992 | INES 0 | CRACKS IN FEED WATER NOZZLES | RINGHALS-1, Sweden |
| 10-04-1992 | INES 0 | LOSS OF AC POWER DURING REFUELING WITH UNLOADED REACTOR | BEZNAU-2, Switzerland |
| 11-09-1991 | INES 0 | FAILURE OF TWO PRESSURIZER SPRAY LINES | BEZNAU-1, Switzerland |
| 12-09-1992 | INES 0 | LOW ACTIVITY WATER LEAK FROM THE CONTAMINATED CONDENSATE TANK | KOLA-3, Russian Federation |
| 15-10-1992 | INES 0 | LEAKAGE FROM REACTOR CIRCUIT PIPE, DIAMETER 26 | IGNALINA-2, Lithuania |
| 24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 2 HIGH LEVEL | KRSKO, Slovenia |
| 24-07-1992 | INES 0 | TURBINE/REACTOR TRIP ON SG 1 HIGH LEVEL | KRSKO, Slovenia |
| 10-11-1992 | INES 0 | SHORT CIRCUIT CAUSED TURBINE/REACTOR TRIP | KRSKO, Slovenia |
| 04-11-1992 | INES 0 | DENT ON THE PIPE OF REACTOR CHANNEL 10-33 TO THE DRUM SEPARATOR | IGNALINA-1, Lithuania |
| 11-01-1993 | INES 0 | FIRE ON HYDROGEN PRESSURE CYLINDER | DUKOVANY-1, Czech Republic |
| 12-01-1993 | INES 0 | CABLE CATCHING FIRE AT THE CONNECTION POINT FOR PORTABLE UTILIZING EQUIPMENT | CHERNOBYL-3, Ukraine |
| 14-01-1993 | INES 0 | WOODEN SLEEPERS STORED AT THE SEPARATING WALL BETWEEN UNITS 3 & 4 CAUGHT FIRE | CHERNOBYL-3, Ukraine |
| 09-02-1993 | INES 0 | FIRE IN A NON-SAFETY RELATED CABINET IN THE CONTROLLED AREA | TIHANGE-1, Belgium |