Europe

Legenda & explanation
date INES title location
24-11-1994INES 1LOSS OF ELECTRICAL SUPPLY OF THE BANK PUMP STATION OF KOZLODUY NPPKOZLODUY-1, Bulgaria
26-08-1994INES 1MISSING LUBRICATION GREASE TO THE ECC SYSTEM'S CORE SPRAY PUMPSBARSEBECK-1, Sweden
28-09-1994INES 1PROTECTION SYSTEM FOR INITIATING BLOW DOWN NOT COMPLETELY REESTABLISHED AFTER REFUELLING OUTAGEBARSEBECK-1, Sweden
15-06-1994INES 1UNINTENTIONAL SLOW INSERTION OF ALL CONTROL RODSFORSMARK-3, Sweden
29-01-1995INES 1HUMAN ERROR INITATED REACTOR TRIPCHERNOBYL-3, Ukraine
12-02-1995INES 1NOT FULLY INSERTED CONTROL RODSRINGHALS-3, Sweden
28-05-1995INES 1ROUTINE SURVEILLANCE REVEALS: STEAM GENERATOR SAFETY VALVES OPEN AT HIGHER PRESSURE THAN SPECIFIED AT THE RINGHALS 2. 3 AND 4 PWRSRINGHALS-2, Sweden
02-06-1995INES 1TURBINE/REACTOR TRIP CAUSED BY AN ERROR IN THE EH CONTROL SYSTEM OF THE TURBINE GENERATORKRSKO, Slovenia
03-01-1994INES 1RENDERING AN EMERGENCY FEEDWATER PUMP AND AN AUXILIARY EMERGENCY FEEDWATER PUMP AVAILABLE FOR A SHORT TIME WITHOUT ADHERANCE TO THE REQUIREMENTS OF THE TECSPECSPAKS-4, Hungary
14-07-1994INES 1SIMULTANEOUS INOPERABILITY OF TWO HIGH-PRESSURE ECCS PUMPSPAKS-4, Hungary
23-12-1992INES 1LEVEL DECREASE IN ECCS TANK 20TJ20B001,2PAKS-2, Hungary
03-05-1993INES 1UNCONTROLLED INCREASE OF REACTOR POWERPAKS-4, Hungary
15-09-1993INES 1DETERIORATION OF NATURAL CIRCULATIONPAKS-2, Hungary
10-07-1995INES 1UNINTENTIONAL RELEASE TO THE SEA OF A MINOR AMOUNT OF SLIGHTLYCONTAMINATED WATERBARSEBECK-1, Sweden
02-05-1995INES 1SHORT VIOLATION OF LIMITS AND CONDITIONS DUE TO ONE AND A HALF HOUR UNAVAILABILITY OF 2 OUT OF 3 SAFETY SYSTEMSDUKOVANY-1, Czech Republic
07-06-1995INES 1PERSONNEL IRRADIATION IN A THERMAL POWER PLANT DURING MAINTENANCE WORKSTPP BORZESTI, Romania
24-11-1994INES 1LOSS OF OFF-SITE AC POWERKOZLODUY-1, Bulgaria
15-07-1995INES 1ONE CLOSED VALVE IN THE CONTAINMENT PRESSURE RELIEF LINE TO THE ATMOSPHERE AND TWO CLOSED VALVES IN THE VENTING LINE TO THE EMERGENCY FILTERFORSMARK-2, Sweden
22-11-1995INES 1AUTOMATIC REACTOR UNLOADING DUE TO SPURIOUS OPENINGS OF VALVES BETWEEN A GROUP OF ECCS PRESSURIZED TANKS AND REACTORIGNALINA-2, Lithuania
30-11-1995INES 1OVEREXPOSURE OF OPERATOR DURING CALIBRATION OF IN-CORE SENSORSIGNALINA-2, Lithuania
01-01-1995INES 1DESIGN DEFICIENCIES IDENTIFIED IN SEPARATION OF ELECTRICAL SYSTEM, AVOIDANCE OF COMMON CAUSE FAILURES IN THE REACTOR PROTECTION SYSTEM AND OVERPRESSURE RELEASE IN THE AUX BUILD.OSKARSHAMN-1, Sweden
26-08-1995INES 1DESIGN DEFICIENCIES IN DIESEL GENERATORS FOUND DURING EXTENDED TESTINGOSKARSHAMN-1, Sweden
15-11-1995INES 1DEVIATION FROM TECHNICAL SPECIFICATIONSRINGHALS-4, Sweden
31-01-1996INES 1Reactor scram followed by the actuation of safety valve in the reactor primary circuitNIIAR Inst., Dimitrovgrad, Russian Federation
21-01-1996INES 1A PART OF THE RESIDUAL HEAT REMOVAL SYSTEM - THE AUXILIARY CONDENSER - TEMPORARILY NOT AVAILABLEOSKARSHAMN-1, Sweden
04-03-1996INES 1FAILURE OF A CONTAINMENT ISOLATION VALVE AT A PERIODICAL TESTOSKARSHAMN-1, Sweden
15-04-1996INES 1Penetration of primary coolant and low level contamination of hermetic boxBOHUNICE-4, Slovakia
24-04-1996INES 1Radioactive contamination at the Unit N3CHERNOBYL-3, Ukraine
30-04-1996INES 1Exceeding allowed maximum primary coolant temperature during planned outageKHMELNITSKI-1, Ukraine
15-05-1996INES 1Small leak of radioactive water from auxiliary building no. 2KOZLODUY-3, Bulgaria